1
7
AJA RH10MD HD Down Converter and DA User Manual
Jumper J2 Settings
Jumper J2 is located at the bottom of the card (shown in the photo below). The
meaning of the jumper settings is detailled in the illustration:
Installation
Typically, RH10MD installation consists of the following:
1.
disconnect power from the frame (remove line cord)
2.
remove the FR1/FR2 front panel
3.
install RH10MD card module
4.
replace the FR1/FR2 front panel
5.
apply power to the frame by connecting a north american-style power cord from
the frame to mains power (90 to 260 VAC)
!
Warning!
Ensure Mains Power is disconnected before installing the FR1 or FR2 frame R-series
modules into the frame, or installing and removing options. If a Mains switch is not
provided, the power cord(s) of this equipment provide the means of disconnection.
The socket outlet must be installed near the equipment and must be easily
accessible.
Warning!
FR2 Dual Power Cord Notice—please read this. To reduce the risk of electrical shock,
disconnect both power cords before servicing equipment.
Caution!
The FR1/FR2 front fan door is heavy and is not hinged. Remove with Caution.
Instructions for removing the frame front door for module installation is discussed in
the
FR1/FR2 User Manual.
1
2
3
6
5
4
Jumper
J2
Jumper Between Pins 1 and 2:
ON = RP215 is used to synchronize 3:2 pulldown sequence
OFF = RP1
88
is used.
In both cases the “A Frame” is synchronized to frame with timecode “xx:00”
Jumper Between Pins 5 and 6:
ON = Output start of vertical blanking lines up with input start of vertical blanking
OFF = Output start of vertical sync lines up with input start of vertical sync (per RP16
8
)
Содержание RH10MD
Страница 16: ...16...