1
29
Io HD Installation and Operation Manual — Io HD Chassis Placement
15.
Click the Restart button to complete the installation procedure. The system
will perform a software restart and be ready for use.
Final Installation Screen
Note:
The AJA Io HD must be powered on prior to booting the computer. If the
Io HD is powered up after the computer, the AJA Control Panel application will not
be able to properly control the unit. If for any reason the Io HD is power cycled while
the computer remains powered, the computer must be rebooted for proper operation
of the Io HD.
When the Io HD is first powered on, valid video output signal is not displayed. To
activate valid video output, the Io HD Control Panel application should be opened
and the appropriate video format desired selected in the Format tab.
Io HD Chassis Placement
The Io HD is designed for use in a variety of environments:
Remote locations
—with its convenient carrying handle and rugged construction, you
can take it just about anywhere for in the field capture and editing - with a
camera, MacBook Pro equipped with an ExpressCard/34 for external RAID
storage, and a storage array, you’re all set. Aside from the camera, these items can
usually fit in a backpack or a specialized carrying case.
Studio
—place on an editing desk or studio table. With its small form factor, rubber
feet, and attractive front panel, the Io HD is at home in any editing studio or bay
alongside an Apple MacPro desktop computer.
Rack
—place on a 19” equipment rackmount shelf (at 8.2” wide, you can fit two on
some rack shelves).
Содержание io hd
Страница 1: ...www aja com Installation and Operation Guide B e c a u s e i t m a t t e r s Published 5 4 11 ...
Страница 4: ...iv ...
Страница 8: ...4 ...
Страница 26: ...18 ...
Страница 32: ...22 ...
Страница 90: ...80 ...
Страница 94: ...A 4 ...
Страница 104: ...B 10 ...
Страница 110: ...I 6 ...