DECK MECHANISM DISASSEMBLY
Gear Assembly P3
Gear Assembly P2
Arm Assembly Idler Jog
Arm Assembly Idler or
(For 2HD Models)
(For 4HD Models)
Base Assembly P3
Base Assembly P2
Chassis
H1
H2
(A)
(B)
(H3)
Gear Assembly P3
Gear Assembly P2
(A)
(B)
Optional Parts
Fig. A-10
65
31. Gear Assembly P3 (Fig. A-10-1)/
Gear Assembly P2 (Fig. A-10-2)
1) Unhook the two Hooks(H1) and lift up the Gear Assembly P3.
2) Unhook the two Hooks(H2) and lift up the Gear Assembly P2.
32. Base Assembly P3 (Fig. A-10-3)/
Base Assembly P2 (Fig. A-10-4)
1) Move the Base Assembly P3 in the direction of the arrow of the
Chassis Hole(A) and push down the Base Assembly P3.
2) Move the Base Assembly P2 in the direction of the arrow of the
Chassis Hole(B) and push down the Base Assembly P2.
33. Arm Assembly Idler Jog or Arm Assembly
Idler (Fig. A-10-5)
1) Unhook the Hook(H3) and push down the Arm Assembly Idler
Jog.
1) Arm Assembly Idler Jog is for 4HD Models.
2) Arm Assembly Idler is for 2HD Models.
1) When reassembling, confirm that the (A) Part of the Gear
Assembly P3 is aligned to the (B) Part of the Gear Assembly P2
as shown below.
NOTE
NOTE
Gear Assembly P3
Gear Assembly P2
(A)
(B)
(Fig. A-10-1)
(Fig. A-10-2)
(Fig. A-10-4)
(Fig. A-10-3)
(Fig. A-10-5)
(Unloading Condition)
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299