
39
Quick Start Guide:
This section provides a brief description of how to operate the E-Drive Head Unit for a new Job
instance.
1.
Check connections and mounting
.
2.
Switch on:
using the green switch on the right side of the monitor. The boot sequence will
take approximately 1.5 minutes.
3.
Start Interface
: Hit the “Start” button on the bottom of the screen.
4.
Create a New Job
: Open the Job Manager and start a new job by clicking “New Job”. Wait
for the interface to load. Important:
Make sure the previous job was saved using the
“Save
Job”
button as unsaved information will be lost when the new job is created.
5.
Set Job Info
: Open the Job Info Dropdown menu and fill in the relevant information. If
applicable, copy information from a previous job (See
). Once finished, hit the “Save
Changes” button to commit the changes. Close the dropdown menu.
Note:
To find this job in the future, it is important to give the Job a Name or set the customer.
6.
Calibrate
: For the best results, it is important to calibrate often.
For a detailed description see
7.
Set Application Rate
: Input the desired rate and press enter.
To see how this is done, see
Hopper Cluster: - Rate Controller and Enter
8.
Start Seeding
: To start seeding, press the hoppers power button.
The drill should be ready to use.
9.
System Check
: Ensure the perceived rate matches the seed rate and that the motor is not
being driven out of bounds. Adjust ground speed appropriately or change gearing if
required.
10.
Finish
: when finished, power off the hoppers and save the job.
General Information:
The application rate can be changed at any point and will update as soon as the “Enter”
button is pressed.
The application can be stopped at any time by either pressing the hopper “Power” button,
or lifting the machine.
Jobs can be saved at any time, as many times as you would like.
The system can be switched off at any time using the green power switch on the right side of
the Monitor without loss of data. The system will boot back into the last session.
Содержание SEEDMATIC 40/4124 E Series
Страница 2: ...1...
Страница 13: ...12 SIMPLE RULES TO FOLLOW FOR SUCCESSFUL PASTURE RENOVATION...
Страница 18: ...17...
Страница 21: ...20 TINE PLACEMENT 4124CT Tine Placement 4024J Tine Placement...
Страница 28: ...27...
Страница 32: ...31 AITCHISON SEEDMATIC Electric Drive Head Unit...
Страница 41: ...40 PARTS BREAKDOWN...
Страница 42: ...41...
Страница 43: ...42...
Страница 44: ...43...
Страница 45: ...44 SEED FERTILISER MODELS SEED ONLY MODELS...
Страница 46: ...45...
Страница 47: ...46...
Страница 48: ...47...
Страница 49: ...48...
Страница 50: ...49...
Страница 51: ...50...
Страница 52: ...51...
Страница 53: ...52...
Страница 54: ...53...
Страница 55: ...54...
Страница 56: ...55...
Страница 57: ...56...
Страница 58: ...57...
Страница 59: ...58...