PROBLEM/SYMPTOM

LIKELY CAUSE(S)

CORRECTION

C. Unit cycles on high/low pressure  

   limit.

1. Loss or restriction of airflow.

2. Restriction in refrigerant circuit.

3. Refrigerant overcharge (following 

field service)

4. Defective pressure control.

1. Check blower assembly for proper operation. Look 

for airflow restrictions, e.g.. the air filter. Check blower 

motor and condenser fan.

2. Check for blockage or restriction, especially filter drier 

and capillary tube assembly.

3. Evacuate and recharge to factory specifications.

4. Check limit cutout pressures. Control is set to actuate at 

approximately 60 PSIG (low pressure) and 650 PSIG (high 

pressure).

D. Unit blows fuses or trips circuit 

breaker.

1. Inadequate circuit ampacity.

2. Short, loose, or improper connection 

in field wiring.

3. Internal short circuit. Loose or 

improper connection(s) in unit.

4. Excessively high or low supply volt-

age or phase loss (3ø only).

1. Note electrical requirements in Chapter 2 and correct 

as necessary.

2. Check field wiring for errors.

3. Check wiring in unit. See wiring and schematic dia-

grams. Test components (especially the compressor) 

for shorts.

4. Note voltage range limitations specific to the compres-

sor troubleshooting section.

E. Water on floor near unit.

1. Obstruction in condensate line.

2. Obstruction or leak in condensate 

pan.

3. Unit is not level.

1. Check for clog or restriction.

2. Check pan for leak or blockage.

3. Level unit.

F. No space heating or reduced heating 

(units equipped with resistance ele-

ments)

1. Defective heating element(s). 

2. Thermal limit open.

3. Defective heater contactor.

1. Check resistance element(s) for continuity. 

2. Check continuity across thermal limit switch.

3. Check relay for proper operation. Replace if defective.

4.3 Compressor 

Troubleshooting

NOTE: It is important to rule out other component failures before condemning the compressor. 
The following electrical tests will aid diagnosis: 
1. 

Start-Up Voltage

: Measure the voltage at the compressor contactor during start-up. The voltage 

must exceed the minimum shown in Table 5, section 2.2, or compressor failure is likely. A low 

voltage condition must be corrected.

2. 

Running Amperage

: Connect a clip-on type ammeter to the (common) lead to the compressor. Turn 

on the supply voltage and energize the unit. The compressor will initially draw high amperage; it 

should soon drop to the RLA value or less. If the amperage stays high, check the motor winding 

resistances. 

NOTE:

 Feel the top of the compressor to see if it has overheated. If it is hot, the internal overload 

may be open. You may have to wait several hours for it to reset. 

Содержание Marvair ComPac II AVHDA90

Страница 1: ...eatures which may not be included on the unit being installed Refer to the unit data label or Model Identification to determine which features and options this unit is equipped with INSTALLER Affix th...

Страница 2: ...T the UNIT UPRIGHT Laying it down on its side may cause oil to leave the compressor and breakage or damage to other components 3 TURN ELECTRICAL POWER OFF AT THE breaker or fuse box BEFORE installing...

Страница 3: ...the building adjacent to the thermostat END USER Retain these instructions for future reference Table of Contents Chapter 1 Air Conditioner Description Specifications 1 1 General Description 5 1 2 Mo...

Страница 4: ...Figure 4a Thermostat Connection Diagram 19 Figure 4b CommStat 3 Wiring Detail 19 Tables Table 1 AVHDA Efficiency and Capacity Ratings at ANSI AHRI Standard 390 6 Table 2 Sensible Capacities Single Co...

Страница 5: ...sible for service beneath external panels All units have internal disconnects Depending upon state and local code requirements this feature may eliminate the need for an external breaker or disconnect...

Страница 6: ...5 100 38 105 41 110 43 115 46 120 49 125 52 79 66 BTUH 73 746 72 487 71 203 69 958 68 689 67 427 66 204 64 956 64 351 63 780 63 209 75 61 77 983 76 678 75 416 74 126 72 843 71 567 70 298 69 071 68 443...

Страница 7: ...ired for maximum cooling utilizing both compressors If 2 stage compressor operation is desired the factory installed jumper between terminals 1 and 2 of the low voltage terminal strip must be removed...

Страница 8: ...LED Indicator Lights COLOR TYPE STATUS DESCRIPTION Green Power Contstant On 24 VAC power has been applied Red Status Contstant On Normal operation Red Status 1 Blink High pressure switch has opened t...

Страница 9: ...e coated Note Cooling capacity may be reduced by up to 5 on units with coated coils Cabinet Color and Material The air conditioners are available in two standard cabinet colors the standard grey with...

Страница 10: ...10 Marvair ComPac AVHDA I O Manual 03 2019 Rev 3 Figure 1 Typical Electrical Schematic for Units with Two Compressors...

Страница 11: ...start the compressor after 24 hours 3 If the compressor will not start makes excessive noise or will not pump return the unit to the freight carrier 2 2 Installation Requirements General 1 Inspect un...

Страница 12: ...24 inches 61 cm 120 inches 305 cm Table 9 Minimum Clearances 6 Codes Make sure your installation conforms to all applicable electrical plumbing building and municipal codes Some codes may limit insta...

Страница 13: ...uilding must take in to account all of these factors and follow best industry practices to provide a safe and secure attachment to the building Mounting bolts for unit mounting flanges The length need...

Страница 14: ...installing duct work The duct system must be engineered to insure sufficient air flow through the unit to prevent over heating of the heater element This includes proper supply duct sizing sufficient...

Страница 15: ...side of the unit Drill a one inch hole in the shelter wall to match this opening Allow sufficient clearance to run 3 4 conduit through the hole and to the unit 2 Lift the unit into position using an...

Страница 16: ...may incorporate an internal crankcase heater for compressor protection The crankcase heater must be energized for at least 24 hours prior to starting the compressor Scrollcompressors likeseveralothert...

Страница 17: ...taneously The panel should ONLY be opened by using the two hinges on the left side OR the two hinges on the right side High Voltage Wiring The power supply should have the proper voltage phase and amp...

Страница 18: ...uctor Class 2 thermostat wire from the air conditioners into the thermostat subbase assembly See Figure 4a for connections to various thermostats 2 Mount the thermostat on the wall of the shelter The...

Страница 19: ...19 Marvair ComPac AVHDA I O Manual 03 2019 Rev 3 Figure 4a Thermostat Connection Diagram Figure 4b CommStat 3 Wiring Diagram...

Страница 20: ...mpressor to start 5 To stop cooling slowly raise the thermostat cooling set point to a temperature higher than the ambient If the unit fails to operate refer to the troubleshooting information in Chap...

Страница 21: ...and good judgement when servicing the air conditioner Use only safe and proven service techniques Use refrigeration goggles when servicing the refrigeration circuit WARNING The refrigerant circuit has...

Страница 22: ...sor troubleshooting section E Water on floor near unit 1 Obstruction in condensate line 2 Obstruction or leak in condensate pan 3 Unit is not level 1 Check for clog or restriction 2 Check pan for lea...

Страница 23: ...icates the lockout fault The control board will enter into and indicate lockout if either of the fault conditions LPS or HPS occur twice The compressor contactor must be closed before the first fault...

Страница 24: ...or from the return grille on the inside of the building Evaporator If the evaporator becomes clogged or dirty it may be cleaned by careful vacuuming or with a com mercial evaporator cleaning spray DO...

Страница 25: ...r this warranty Airxcel Commercial Group will honor its warranty and furnish the required replacement part All costs for shipment and risk of loss during shipment of the product toAirxcel Commercial G...

Страница 26: ...______ Address ________________________________________State________________________ City ___________________________________________ Marvair Air conditioner Model No _________________________________...

Страница 27: ...L2_______V L1 L3 ________V L2 L3______V L1 L2 L1 L3 L2 L3 3 Avg Voltage _______________ Max Deviation from avg voltage ______________volts Voltage imbalance 100 x Max Deviation avg Voltage ___________...