SM YAZE218 1-A.2 GB | 11—19
11—CONTROL SYSTEM
4. During the test, the unit will show count down counter (in minutes). The test maximum time is 20
minutes.
5. When the test is nished, the system will show the test result, pass or fail.
6. You can scroll the menu to observe:
a. Observe the matrix result
b. Guide for problem correction.
7. For xing problem, copy on paper the results displayed results, power off the unit, and then x the
problem accordingly. Do not do any wire xing under power!
Note:
You can exit the installation test any moment by pressing Esc for 5 seconds.
When exiting the test, the system will still keep the latest result from the previous test.
Содержание YAZE218
Страница 11: ...4 1 SM YAZE218 1 A 2 GB 4 OUTLINE DIMENSIONS 4 OUTLINE DIMENSIONS 4 1 Indoor Unit HJD009 012 ...
Страница 13: ...4 OUTLINE DIMENSIONS 4 3 SM YAZE218 1 A 2 GB 4 3 Indoor Unit SXE009 012 4 4 OUTDOOR UNIT YAZE218 ...
Страница 25: ...6 2 SM YAZE218 1 A 2 GB 6 OPERATING CURVES 6 1 2 Heating Technician Mode ...
Страница 26: ...SM YAZE218 1 A 2 GB 6 3 6 OPERATING CURVES 6 1 3 Tubing Length correction Factor ...
Страница 28: ...SM YAZE218 1 A 2 GB 8 1 8 WIRING DIAGRAMS 8 WIRING DIAGRAMS 8 1 YAZE218 Wiring Diagrams ...
Страница 29: ...8 WIRING DIAGRAMS 9 1 SM YAZE218 1 A 2 GB 9 REFRIGERATION DIAGRAMS 9 1 YAZE218 Cooling Mode ...
Страница 30: ...8 WIRING DIAGRAMS SM YAZE218 1 A 2 GB 9 2 9 2 YAZE218 Heating Mode ...
Страница 77: ...14 1 SM YAZE218 1 A 2 GB 14 APPENDIX A 14 APPENDIX A INSTALLATION AND OPERATION MANUAL ...
Страница 78: ...SERVICE MANUAL YAZE218 ...