CONTROL
SYSTEM
11-16
SM YAZ218 1-A.2 GB
11.5.11.2 Deicing Protection Procedure
COMP
RV
OFAN
EEV
ON
HEAT
COOL
Any
OFF
Any
T1
T2
T3
T3
T1
OCT
0
Threshold
T1 = T2 = 36 seconds, T3 = 6 seconds
11.5.11.3 Condensate Water over Flow Protection
Each of the pins P1, P2, P3 can have two options:
1 – When it is shorted with P4
0 – When it is not shorted to P4
11.5.11.4 3 Levels Logic (used in floor/ceiling models)
P2 P3 Level
0 0 L0
1 0 L1
1 1 L2&3
0 1 L4
Содержание /yaz218
Страница 17: ...OUTLINE DIMENSIONS SM YAZ218 1 A 2 GB 4 1 4 OUTLINE DIMENSIONS 4 1 Indoor Unit PNXA009 012 ...
Страница 19: ...OUTLINE DIMENSION SM YAZ218 1 A 2 GB 4 3 4 3 Indoor Unit SX09 12 DCI 4 4 Indoor Unit XLF09 12 DCI ...
Страница 20: ...OUTLINE DIMENSIONS SM YAZ218 1 A 2 GB 4 4 4 5 Indoor Unit DLF09 12 DCI ...
Страница 21: ...OUTLINE DIMENSION SM YAZ218 1 A 2 GB 4 5 4 6 OUTDOOR UNIT YAZ218 出气口 进气口 ...
Страница 32: ...OPERATING CURVES SM YAZ218 1 A 2 GB 6 1 6 OPERATING CURVES 6 1 Model YAZ218 DCI 6 1 1 Cooling Technician Mode ...
Страница 33: ...OPERATING CURVES 6 2 SM YAZ218 1 A 2 GB 6 1 2 Heating Technician Mode ...
Страница 34: ...OPERATING CURVES SM YAZ218 1 A 2 GB 6 3 6 1 3 Tubing Length correction Factor ...
Страница 37: ...REFRIGERATION DIAGRAM SM YAZ218 1 A 2 GB 9 1 9 REFRIGERATION DIAGRAM 9 1 YAZ218 Cooling Mode ...
Страница 38: ...REFRIGERATION DIAGRAM 9 2 SM YAZ218 1 A 2 GB 9 2 YAZ218 Heating Mode ...
Страница 39: ...TUBING CONNECTIONS SM YAZ218 1 A 2 GB 10 1 10 TUBING CONNECTIONS ...
Страница 84: ...EXPLODED VIEW AND SPARE PART LIST SM YAZ218 1 A 2 GB 14 1 14 APPENDIX A INSTALLATION AND OPERATION MANUAL ...