Airwell IOM PAC 01-N-7GB Скачать руководство пользователя страница 5

3

POWER SUPPLY MUST BE 

SWITCHED OFF

BEFORE STARTING WORK 

IN THE ELECTRIC

CONTROL BOX

GENERAL RECOMMENDATIONS

Please read the following safety precautions very carefully before installing the unit.

SAFETY DIRECTIONS

Follow the safety rules in forces when you are working on your appliance.
The installation, commissioning and maintenance of these units should be performed by qualified personnel having 
a good knowledge of standards and local regulations, as well as experience of this type of equipment.
The unit should be handled using lifting and handling equipment appropriate to the unit's size and weight.
Any wiring produced on site must comply with the corresponding national electrical regulations.
Make sure that the power supply and its frequency are adapted to the required electric current of operation, taking 
into account specific conditions of the location and the current required for any other appliance connected to the 
same circuit.
The unit must be EARTHED to avoid any risks caused by insulation defects.
It is forbidden to start any work on the electrical components if water or high humidity is present on the installation 
site.

WARNING

Cutoff power supply before starting to work on the appliance.
When making the hydraulic connections, ensure that no impurities are introduced into the pipe work.

The manufacturer declines any responsibility and the warranty becomes void if these instructions 
are not respected.

If you meet a problem, please call the Technical Department of your area.
If possible, assemble the compulsory or optional accessories before placing the appliance on its final location. (see 
instructions provided with each accessory).

In order to become fully familiar with the appliance, we suggest to read also our Technical Instructions.
The information contained in these Instructions are subject to modification without advance notice.

Содержание IOM PAC 01-N-7GB

Страница 1: ...nte sanitaria Installation and maintenance manual Manuel d installation et de maintenance Installations und Wartungshandbuch Manuale di installazione e di manutenzione Manual de instalaci n y de mante...

Страница 2: ......

Страница 3: ...INSTALLATION INSTRUCTION NOTICE D INSTALLATION INSTALLATIONSHANDBUCH ISTRUZIONI INSTALLAZIONE instRUCCIONES DE INSTALACI N...

Страница 4: ...mensions 5 TECHNICAL SPECIFICATIONS 5 PRESSURE LOSS 5 INSTALLATION 6 CLEARANCE 6 FITTING 6 hydrauliC LINKS TO THE CENTRAL HEATING LOOP 7 3 WAY HEATING DOMESTIC HOT WATER VALVE 7 ELECTRICAL CONNECTIONS...

Страница 5: ...specific conditions of the location and the current required for any other appliance connected to the same circuit The unit must be EARTHED to avoid any risks caused by insulation defects It is forbi...

Страница 6: ...ng conditions must be respected in order to maintain the validity of the warranty Commissioning shall be performed by specialised technicians from technical services approved by the manufacturer Maint...

Страница 7: ...Disease protection treatment 230V 1 Ph 50Hz 400V 3 Ph 50Hz Maximum current A 15 5 Fuse Gg A 16 6 Max power supply cable section mm 3G2 5 4G1 5 Pressure loss Water flow l h kPa 0 0 05 0 10 0 15 0 20 0...

Страница 8: ...en installing the system take care to leave sufficient free space all around the tank for servicing operations The indicated minimum free distances must be respected to ensure an easy access ELECTRIC...

Страница 9: ...ff 3 way valve directs hot water produced by the PAC to either the heating circuit or the domestic hot water tank Hydraulic connections must be made in accordance with the circuit layout diagrams prov...

Страница 10: ...eating expansion This volume of water can reach 3 of the water accumulator s capacity 8 The safety valve must be operated at least once a month by triggering the system drainage device GENERAL INSTALL...

Страница 11: ...k the general tightness of all cable connections hydrauliC CIRCUIT 1 Check that the hydraulic circuit is filled properly and that the fluid flows freely without any signs of leakage or air bubbles DOM...

Страница 12: ...10...

Страница 13: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO...

Страница 14: ...VII Aqu Scop Advance DCI VII Aqu Scop Advance SPLIT DCI VIII abmessungen III ELEKTRISCHE ANSCHL SSE UND VERBINDUNGEN IV PAC HT VI Aqu Scop HT VI Aqu Scop HT SPLIT VII Aqu Scop Advance DCI VII Aqu Sco...

Страница 15: ...s Sortie circuit primaire 1 gaz femelle Austritt Prim rkreislauf 1 Innengewinde Gas Uscita circuito primario 1 gas femmina Salida circuito primario 1 gas hembra E Recycling circuit optional Circuit de...

Страница 16: ...ALLEGATO ANEXO ELECTRICAL CONNECTIONS AND INTERCONNECTIONS RACCORDEMENTS ELECTRIQUES ET INTERCONNECTIONS ELEKTRISCHE ANSCHL SSE UND VERBINDUNGEN COLLEDAMENTI ELETTRICI E INTERCONNESSIONI CONEXIONES EL...

Страница 17: ...V APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO...

Страница 18: ...HW WT DHW WT DOMESTIC HOT WATER TANK DHW WT BRAUCHWASSERVERSORGUNG DHW WT ACUMULADOR DE AGUA CALIENTE SANITARIA DHW WT PALLA DI ACQUA CALDA SANITARIA PC PC REGULATEUR DE L AQU SCOP HT PC AQU SCOP HT C...

Страница 19: ...COP ADVANCE DCI PC CONTROLLO ELETTRONICO DEL AQU SCOP ADVANCE DCI PC CONTROL DE LA AQU SCOP ADVANCE DCI DHW WT AQU SCOP ADVANCE DCI Aqu Scop HT SPLIT AQU SCOP HT SPLIT DHW WT BALLON D EAU CHAUDE SANIT...

Страница 20: ...R TANK DHW WT BRAUCHWASSERVERSORGUNG DHW WT ACUMULADOR DE AGUA CALIENTE SANITARIA DHW WT PALLA DI ACQUA CALDA SANITARIA AQU SCOP ADVANCE SPLIT DCI DHW T SONDE DE TEMPERATURE D EAU SANITAIRE DHW T DOME...

Страница 21: ......

Страница 22: ......

Страница 23: ...mpliance declaration Under our own responsibility we declare that the product designated in this manual comply with the provisions of the EEC directives listed hereafter and with the national legislat...

Страница 24: ...rherige Ank ndigung ge ndert werden Fotos nicht vertraglich bindend A causa della politica di continua miglioria posta in atto dal costruttore questi prodotti sono soggetti a modifiche senza alcun obb...

Отзывы: