![Airwell AWSI-CBV005-N11 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/airwell/awsi-cbv005-n11/awsi-cbv005-n11_operation-and-installation-manual_2880018011.webp)
9
2. Location Relationship among Ceiling Hole, Unit and Hoisting Studs
Note: Before suspending the indoor unit, select the installation location according to the piping
and wiring in the ceiling, and determine the lead direction of the piping. Prepare all pipes (refrigerator
and drainage) and wiring (connection line for remote control and connection line of indoor units
and outdoor units) connected to indoor units before suspending the indoor unit so as to make
the connections right after the installation.
In the situation with the ceiling, before suspending the unit, set refrigerant pipe, drainpipe,
connection line in the room, lead wire of line control to the locations of piping and wiring.
Confirm the size of the indoor unit and fix it according to the requirements in the manual.
Installation Procedures
gap between studs 535mm
indoor unit 570mm
ceiling 650mm
decorated board 700mm
holder
decorated board
ceiling
The ceiling and decorated board overlapping
part should be more than 25mm
gap between studs 790mm
indoor unit 840mm
ceiling 890mm
decorated board 950mm
holder
decorated board
ceiling
The ceiling and decorated board overlapping
part should be more than 25mm
model
A (mm)
240
295
CCV018-024
CCV030-048
B (mm)
135
140
CBV005-016
CCV018-048
Содержание AWSI-CBV005-N11
Страница 24: ......