Functions and control
17
Domestic air conditioner
F-MIN-d(compressor’s Min_hz)< F<F-MAX-d(compressor’s Max_hz)
When heating, it is needed to satisfy
F-MIN-r (compressor’s Min_hz)< F<F-MAX-r (compressor’s Max_hz)
PID control :
The innital frequency Sn is determined by Pn . We can calculate Hzoutf according to the value of Kp ,Ki ,Kd,
Out_gain,Pn.Then , Fn = Sn + Hzoutf. The value of Fn is calculated in each sample time (60 seconds),and Fn is
adujusted according to previous frequency of Sn and filtered output of Hzoutf.
7.1.2 The outdoor fan control (Exchange fan)
When the fan is changed among every airflow speed (including stop blowing), in order to avoid the
airflow speed from skipping frequently, it must be kept under each mode for over 30 seconds, and then
it can be changed to another mode (when refrigerating, the time is changed to 15 seconds).
7.1.2.1 The outdoor fan control
Within three minutes of compressor starting, the compressor is controled according to the ambient temperature.
Tao
˄ć˅
Tao
<22
ć
22
ć
< Tao <28
ć
Tao
ı
29
ć
Refrigeration/dehumidification
(09K/12K)
2nd
level /3
level 3rd
level /5th
level 5th
level /7th
level
Tao
˄ć˅
Tao
<<10
ć
10
ć
< Tao <16
ć
Tao
ı
16
ć
Heating
7th level /7th
level
5th level /5th
level 3rd
level /3rd
level
After 3 minutes, the compressor is controled according to the ambient temperature and the frequency of the
compressor.
Refrigeration/dehumidification
frequency
˄
Hz
˅
09K
˄
12K)
<38 Hz
˄
30 Hz
˅
38 Hz
˄
30 Hz
˅
-52 Hz
˄
60 Hz
˅
ı
52 Hz
˄
60 Hz
˅
Tao
˄ć˅
İ
22
2nd level
3rd level
5 th level
22-28
3rd level
5 th level
7 th level
ı
28
7 th level
Heating frequency
˄
Hz
˅
(09K/12K)
<51 Hz
51-70 Hz
ı
70 Hz
Tao
˄ć˅
İ
10
2nd level
3rd level
5 th level
10-17
3rd level
5 th level
7 th level
ı
17
2nd level
7.1.3 The control of the outdoor Electronic expansion valve (EEV)
(09K series have no this function)
In cooling mode, the EEV opening range is 120~480 steps. The EEV opening is 120 steps when unit is
off.
In heating mode, the EEV opening range is 60~480 steps. The EEV opening is 60 steps when unit is
off.
After outdoor unit is off, the EEV opening keep the current on for 5 s, then open the EEV completely for
2 minutes, then become 120 steps (cooling) or 60 steps (heating).
The EEV opening will increase if SH (superheat degree) >0 while decrease if SH<0.
Содержание AW-YHDM012-H91
Страница 10: ...Pinping diagrams Domestic air conditioner 4ˊPiping diagrams 9 EEV EEV ...
Страница 11: ... Operation range Domestic air conditioner 5ˊOperation range 10 ...
Страница 38: ...Service diagnosis 37 Domestic air conditioner ...
Страница 57: ...57 Do C omestic air ircuit Diagra conditioner ams r 12 2 Module board circuit diagram ...
Страница 59: ...Removal Procedure 1 Removal of Outdoor Panel ...
Страница 60: ...Removal Procedure n o i t i d n o C r i A c i t s e m o D 2 ...
Страница 61: ...4 Removal Procedure 3 Domestic Air Condition ...
Страница 62: ...Removal Procedure 2 Removal of Electrical Box RPHVWLF LU RQGLWLR ...
Страница 63: ...Removal Procedure 3 Removal of Fan and Fan Motor RPHVWLF LU RQGLWLR ...
Страница 64: ...Removal Procedure 4 Removal of Fan Motor Brcked and Partition ...
Страница 65: ...Removal Procedure 7 Domestic Air Condition ...
Страница 66: ...Removal Procedure 5 Removal of Compressor and Heat Exchanger ...
Страница 67: ...Removal Procedure 9 Domestic Air Condition ...