Chapter 4
l
RN commissioning
Verifying SNTP time
Airvana ipBTS C30 Installation and Commissioning, Release 4.0
4-11
Verifying SNTP time
Follow this procedure to verify the ipBTS C30 is receiving the correct timing information from
the BTS.
1. From the CLI console, enter
ipBts-XXX>
show sntp time
to display the current
UTC time and output similar to this:
Sntp Time Details - UTC
Timing Source = 10.10.50.4
Base Secs = 3219347575 (bfe35877)
Base Nsecs = 820540580 (30e874a4)
Base TBH = 11 (0000000b)
Base TBL = 3003409790 (b304657e)
Current Secs = 3219347773 (bfe3593d)
Current Nsecs = 863521250 (337849e2)
Num Leap Secs (since 1980) = 13
Date = 2007:1:6
Time = 23:16:13.863
2. Verify that the date and time are correct.
Commissioning the ipBTS C30
This section describes how to configure the ipBTS C30 using the Commissioning script.
Specifically, it contains the following section:
•
Using the Commissioning script
Using the Commissioning script
Follow this procedure to configure the ipBTS C30 using the Commissioning script.
For more information about the Commissioning script, contact your network planner.
1. Download the Commissioning script from your laptop to the ipBTS C30’s
disk0:/
config
directory.
2. From the tool-bar, select the
CLI
button.
3. Press
<Enter>
.
The
ipBts-XXX>
prompt displays and indicates you are in EXEC Mode.
4. Enter the following commands to enter Privileged EXEC Mode and run the
Commissioning script (<
script_filename
>).
ipBts-XXX>
enable
ipBts-XXX#
copy disk0:/config/<
script_filename
>
system:running-config
Содержание ipBTS C30
Страница 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Страница 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Страница 19: ...About this document Notes cautions and warnings Airvana ipBTS C30 Installation and Commissioning Release 4 0 6 ...
Страница 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Страница 26: ...Chapter 1 l ipBTS system overview Replaceable RN modules 1 6 910136 Rev01 00 Standard July 2007 ...
Страница 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Страница 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Страница 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Страница 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Страница 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Страница 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...