
iRelay 460 Equipment Installation Guide
UGD-D01035
Airspan Commercial and Internal Use
34
4.2
Cable trays installed for cable routing (if
applicable)
4.3
Tower climbing ladder installed properly (if
applicable)
4.4
Pole mounts are installed on the tower at
required heights and Azimuth
4.5
Availability of space for pole mount bracket
(if pole mount is not installed)
4.6
Pole mount are fixed properly
☐
Yes
☐
No
4.7
Pole mount diameter (1-4”)
5
Cable/Length Estimate
5.1
Length of the Cat5e cable required at site
5.2
Length of the power cable required at site
5.3
Length of the grounding cable
6
Remarks
Details of the Survey Engineer
Name:______________________________________________
Mobile No:__________________________________________
Visit No:____________________________________________
Reason for the visit:__________________________________
Signature:____________________________
Date:________________________________