
Page
4
of
5
Set up:
- Unfold the Top Part of the unit and inflate it. Please note the Top Part requires 2 fans.
- Roll the unfolded Bed inside the inflated Top structure.
- Insert the 2 plastic pipes into their specific place.
- Unfold the bed and pull the 2 filler pipes through the plastic pipes.
CARABINER WEBBING
CONNECTION POINTS
BED