![Airobotics Optimus-1 EX-FTS Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/airobotics/optimus-1-ex-fts/optimus-1-ex-fts_mast-assembly-procedure_2878594032.webp)
OPT1-M-104 Rev.01
Optimus-1 EX - FTS Mast Assembly Procedure
Page 32 of 33
7.
Turn ON the Mast main power switch (see
8.
Make sure that the POE injector Green LED "P1" is turned on (see Figure 30).
9.
Make sure that the POE injector Orange LED "POE IN-USE" is turned on (see Figure 30).
Figure 30 The P1 and POE In-Use indicator LEDs
10.
The FTS Mast Unit has been successfully installed.
P1
POE IN-USE