AirKing AK150H Скачать руководство пользователя страница 7

www.airkinglimited.com

6728035 Rev. R 12-18

7 of 16

REPLACEMENT PARTS DIAGRAM

All Models

#

Qty. Description

Replacement Part #

1

4

Mounting Rails

5S1299002

2

1

6" Metal Collar Assembly

5S5299100

3

2

Grill Springs

5S1202046

4

1

Ceiling Flange

5S1202050

5

2

Mounting Channel

5S1202123

6

1

Blower Assembly

5S2239008

Specific to Models E80S, E110S, E130S

#

Qty. Description

Replacement Part #

7

1

Grill

5S1202048

9

1

Wire Compartment Assembly - E80S

5S1239858

1

Wire Compartment Assembly - E110S

5S1239892

1

Wire Compartment Assembly - E130S

5S1239859

Specific to Model AK150LS

#

Qty. Description

Replacement Part #

7

1

Grill

5S1202048

8

1

Wire Compartment Assembly

5S1239860

Specific to Model AK150H

#

Qty. Description

Replacement Part #

7

1

Grill

5S1202048

12

1

Wire Compartment Assembly

5S1202640

10

1

Knob

5S1299802

11

1

Humidity Sensor Compartment

5S1239826

Specific to Models E80SG, E130SG

#

Qty. Description

Replacement Part #

16

1

Wire Compartment Assembly - E80SG

5S1239861

Wire Compartment Assembly - E130SG

5S1239862

13

1

Grill Assembly

5S1239115

17

1

Motion Sensor

5S1999100

Specific to Models E80SH, E130SH

#

Qty. Description

Replacement Part #

7

1

Grill

5S1202048

15

1

Wire Compartment Assembly - E80SH

5S1239863

1

Wire Compartment Assembly - E130SH

5S1239864

10

1

Knob

5S1299802

11

1

Humidity Sensor Compartment

5S1239826

Specific to Models E80SGH, E130SGH

#

Qty. Description

Replacement Part #

14

1

Wire Compartment Assembly - E80SGH

5S1239874

Wire Compartment Assembly - E130SGH

5S1239875

10

1

Knob

5S1299802

11

1

Humidity Sensor Compartment

5S1239826

13

1

Grill Assembly

5S1239115

17

1

Motion Sensor

5S1999100

2

1

3

7

1

6

4

5

8

10

14

11

10

11

12

10

15

11

16

13

17

9

Содержание AK150H

Страница 1: ...fire related construction b Sufficient air is needed for proper combustion and exhausting of gases through the flue chimney of fuel burning equipment to prevent back drafting Follow the heating equip...

Страница 2: ...e previously cut hole so that it is flush with the finished ceiling Secure the ends of the rails to the joists Figure 1 www airkinglimited com 6728035 Rev R 12 18 2 of 16 SECTION 4 Ducting NOTE 6 OR L...

Страница 3: ...ording to all local and national codes Humidity Sensing Models 4a For proper operation the humidity sensing fan will require a 3 way switch not included Run wiring between the fan and the switch locat...

Страница 4: ...ompartment cover Plug the 3 pin quick connect motor cord into the shorter end of the included harness then into the receptacle located on the top of the wire compartment cover These cords will only fi...

Страница 5: ...he fan will operate If the room is occupied longer the fan will continue to run until the room is vacated and the occupancy time delay has elapsed 2b Locate the motion sensor on the fan s grill and pr...

Страница 6: ...does not cover shipping costs for the return of products to Air King for repair or replacement Air King will pay return shipping charges from Air King following warranty repairs or replacement ANY AN...

Страница 7: ...rill 5S1202048 12 1 Wire Compartment Assembly 5S1202640 10 1 Knob 5S1299802 11 1 Humidity Sensor Compartment 5S1239826 Specific to Models E80SG E130SG Qty Description Replacement Part 16 1 Wire Compar...

Страница 8: ...www airkinglimited com 6728035 Rev R 12 18 8 of 16 NOTES...

Страница 9: ...combustion et l vacuation de gaz par le conduit chemin e provenant d quipement de br lage au combustible pour pr venir un refoulement Suivre les directives du fabricant de l quipement de chauffage et...

Страница 10: ...des rails aux solives Figure 1 www airkinglimited com 6728035 Rev R 12 18 10 of 16 SECTION 4 Conduits NOTE UN CONDUIT PLUS RIGIDE DE 6 PO OU PLUS EST RECOMMANDE POUR UNE MEILLEURE PERFORMANCE ATTENTI...

Страница 11: ...pr sents REMARQUE L unit doit tre mise la terre selon les codes locaux et nationaux Mod les avec d tection d humidit 4a Pour un bon fonctionnement le ventilateur de d tection d humidit exigera un inte...

Страница 12: ...la vis qui fut enlev e pr c demment SECTION 6 Compl tion de l installation 1 Il est recommand d utiliser un scellant appropri pour le contact avec les mat riaux de construction actuels et pour les bes...

Страница 13: ...git d un minimum de temps que le ventilateur fonctionne Si la salle est occup e plus longtemps le ventilateur continuera de fonctionner jusqu ce que la salle est vide et le temps du d lai d occupation...

Страница 14: ...manipulation ou op ration de dommages d exp dition d abus de mauvaise utilisation de r paration faite ou tent es non autoris es Cette garantie ne couvre pas les co ts d exp dition pour le retour des p...

Страница 15: ...ompartiment du capteur d humidit 5S1239826 www airkinglimited com 6728035 Rev R 12 18 15 of 16 Particularit s des mod les E80SG E130SG Qt Description de pi ce de remplacement 16 1 Assembl e du compart...

Страница 16: ...www airkinglimited com 6728035 Rev R 12 18 16 of 16 REMARQUE...

Отзывы: