background image

Airglas, Inc.

 Manual # GLH3000-105 

16 | 

P a g e

 

MANUAL REVISION B  

 

 

 

 

 

 

27 July 2011 

THIS MANUAL INCLUDES INFORMATION PROPRIETARY TO 

Airglas, Inc.

 AND SHALL NOT BE USED TO MANUFACTURE OR REPRODUCE ANY PART OR 

ASSEMBLY WITHOUT THE PRIOR WRITTEN PERMISSION OF

 

Airglas, Inc.

 

9.0

 

Drawings and Diagrams 

 

 

 

Descriptive Data List No. GLH3000-I 

 

 

ICA, Installation & Maintenance  

GLH3000-105 

Rev B 

27 July 2011 

 Ski Installation Piper PA-18  

GLH3000-1-PA18 

Rev B 

1 Mar 2011 

Ski Installation A-1 Series 

GLH3000-1-A1 

Original 

28 July 2011 

Hydraulic System 

GLH3000-6 

Original 

3 Sep 2009 

Electrical Schematic 

GLH3000-7 

Rev B 

22 Dec 2010 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page Revision B 

 

 

Содержание GLH3000 Nose Ski

Страница 1: ...T OR ASSEMBLY WITHOUT THE PRIOR WRITTEN PERMISSION OF Airglas Inc Airglas Inc Instructions for Continued Airworthiness Including Installation Maintenance and Service Instructions MANUAL NO GLH3000 105...

Страница 2: ...ION B 27 July 2011 THIS MANUAL INCLUDES INFORMATION PROPRIETARY TO Airglas Inc AND SHALL NOT BE USED TO MANUFACTURE OR REPRODUCE ANY PART OR ASSEMBLY WITHOUT THE PRIOR WRITTEN PERMISSION OF Airglas In...

Страница 3: ...Revision Distribution of Changes A new copy of the revised manual or affected pages will be maintained on the Airglas Inc website Page Revision B REV LEVEL REV DATE Page REV BY EXPLANATION OF REVISIO...

Страница 4: ...CTION AND DESCRIPTION 6 B PLACARDS AND MARKINGS 7 B INSTALLATION 8 9 B CONTROL AND OPERATION 10 A SERVICING INFORMATION 11 A INSTRUCTIONS FOR CONTINUED AIRWORTHINESS 12 13 A SPECIFICATIONS with WEIGHT...

Страница 5: ...THOUT THE PRIOR WRITTEN PERMISSION OF Airglas Inc Sections Page 1 0 Introduction and Description 6 2 0 Placards and Markings 7 3 0 Installation Ski Attachment 8 9 4 0 Control and Operation 10 5 0 Serv...

Страница 6: ...lic or hand pump to provide operating pressure The door closes off the wheel opening thus creating the performance characteristics of a straight ski When the airplane is on snow deploying to the ski p...

Страница 7: ...8 MPH All Models o The upper part of the green arc is located at 110 MPH PA 18 Series Place Airspeed Restriction Placard on instrument panel immediately adjacent to Airspeed Indicator and in full view...

Страница 8: ...etween the exiting holes 2 The brake lines may have to be modified or changed to allow for the new position of the caliper 3 Prior to initial ski installation the aircraft will need to be hoisted or j...

Страница 9: ...ines must be routed and secured so that they do not interfere with flight controls and are not able to chafe See Note 1 5 Power supply and control wires for the pump must be routed through the aircraf...

Страница 10: ...ill remain lit as long as the skis are extended 2 When the switch is pressed down the door will retract and expose the tire While the switch is held down an operation indicator green light will illumi...

Страница 11: ...e tire The cartridge wheel bearings should be replaced when damaged When the tire has worn more than 50 the wheel should be replaced The rigging is made up of galvanized steel 5 32 cable for the ice c...

Страница 12: ...PERATIONAL CHECKS 10 14 Check 10 hour or 14 day inspection 1 CHECK Bungees cables clevis pins cotter pins nuts bolts and attach fittings for security 2 CHECK Cylinders for leaks at the seals and fitti...

Страница 13: ...ulic pump for secure mounting wiring condition reservoir for contaminants or sediment and leaks Inspect internal and external hydraulic lines for security chafing and leaks Service with MIL H 5606 Hyd...

Страница 14: ...Airglas Inc AND SHALL NOT BE USED TO MANUFACTURE OR REPRODUCE ANY PART OR ASSEMBLY WITHOUT THE PRIOR WRITTEN PERMISSION OF Airglas Inc 7 0 Ski Specifications Ski Specifications are as follows Length 7...

Страница 15: ...ly Correction Reconnect the hydraulic supply lines to opposite ports on the pump and reverse the pump power polarity Problem Skis do not cycle smoothly or have pulsing or incomplete actuation Correcti...

Страница 16: ...THOUT THE PRIOR WRITTEN PERMISSION OF Airglas Inc 9 0 Drawings and Diagrams Descriptive Data List No GLH3000 I ICA Installation Maintenance GLH3000 105 Rev B 27 July 2011 Ski Installation Piper PA 18...

Страница 17: ...THE PRIOR WRITTEN PERMISSION OF Airglas Inc 10 0 Engineering Changes and Amendments In the event that a change or amendment is made to the design components or procedures contained within this manual...

Отзывы: