
506878-01
Page 23 of 62
Issue 1139
1. Use transition solvent cement or a sheet metal screw
to secure the intake pipe to the inlet air connector.
2. Route piping to outside of structure. Continue with
installation following instructions given in general guide
lines for piping terminations and in intake and exhaust
piping terminations for direct vent sections. Refer to
Table 5 for pipe sizes.
Follow the next two steps when installing the unit in
Direct
Vent applications,
where combustion air is taken from
outdoors and flue gases are discharged outdoors.
The
provided air intake screen must not be used in direct
vent applications (outdoors).
Figure 26
Typical Air Intake Pipe Connections
Horizontal Non-Direct Vent Applications
(Horizontal Right-Hand Air Discharge Application Shown)
NOTE:
Debris screen may be positioned straight out (preferred) or
with an elbow rotated to face down.
Figure 25
Typical Air Intake Pipe Connections
Upflow Non-Direct Vent Applications
NOTE:
Debris screen and elbow may be rotated, so that screen
may be positioned to face forward or to either side.
Содержание 95G2UHV
Страница 3: ...506878 01 Page 3 of 62 Issue 1139 EXPANDED VIEW Figure 1 ...
Страница 28: ...506878 01 Page 28 of 62 Issue 1139 Figure 31 FIELD SUPPLIED WALL TERMINATION ...
Страница 29: ...506878 01 Page 29 of 62 Issue 1139 Figure 32 ...
Страница 35: ...506878 01 Page 35 of 62 Issue 1139 Figure 47 TRAP DRAIN ASSEMBLY USING 1 2 PVC or 3 4 PVC ...
Страница 46: ...506878 01 Page 46 of 62 Issue 1139 TYPICAL WIRING DIAGRAM Figure 56 ...
Страница 60: ...506878 01 Page 60 of 62 Issue 1139 Start Up Performance Check List UNIT SET UP ...
Страница 61: ...506878 01 Page 61 of 62 Issue 1139 UNIT OPERATION Heating Mode Cooling Mode ...