background image

3

INSTALLATION

WARNING!  IF  THE  MOUNTING  PLACE  IS  LOCATED  AT  HIGH  ALTITUDE,  PLEASE  REFER  TO  A  MOUNTING  COMPANY  POSSESSING 

APPROPRIATE MOUNTING EQUIPMENT!

Installation is shown on the example of the 300 ventilation hood.
For t

ype 

1000 units, two hoods must be installed.

Route the air ducts outside of 
the outer wall on which the 
hood will be installed. 
Cut the excess of the air ducts.

10-12 mm

Disassemble the hood to enable 
access to the fastening holes. 
Remove the screws that secure 
the front part of the hood and 
remove it.

Mark the holes using the back 
part of the ventilation hood.
Drill 4 holes for the dowels.

Fix the back part of the hood to 
the wall.

Install the front part of the hood 
and fix it with screws.

Отзывы: