![Air King AK964 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/air-king/ak964/ak964_operating-manual_2874415003.webp)
SECTION 4
Ducting
CAUTION:
ALL DUCTING MUST COMPLY WITH LOCAL AND NATIONAL
BUILDING CODES.
1. Remove any tape that might be holding the damper in place. Connect the ducting to the
fan’s duct collar
(Figure 8)
and secure in place using tape or screw clamp. Always duct
the fan to the outside through a wall or roof cap.
SECTION 5
Wiring
CAUTION:
MAKE SURE POWER IS SWITCHED OFF AT SERVICE PANEL BEFORE
STARTING INSTALLATION.
WARNING:
THIS UNIT MUST BE WIRED ON A SEPARATE 20 AMP CIRCUIT.
WARNING:
USE APPROPRIATELY SIZED COPPER CONDUCTORS ONLY RATED
FOR AT LEAST 75°C.
CAUTION:
ALL ELECTRICAL CONNECTIONS MUST BE MADE IN ACCORDANCE
WITH LOCAL CODES, ORDINANCES, OR NATIONAL ELECTRICAL CODE. IF YOU ARE
UNFAMILIAR WITH METHODS OF INSTALLING ELECTRICAL WIRING, SECURE THE
SERVICES OF A QUALIFIED ELECTRICIAN.
1. Run wiring from approved wall switches carrying the appropriate rating. One neutral
(white), one ground (green or bare copper), and three hot (black, red, blue leads
connected to the switch, one for each function). Secure the electrical wires to the
housing with an approved electrical connector. Make sure you leave enough wiring in
the box to make the connection to the fan’s receptacles.
2. Connect the white wire from the house to the three white wires from the fan. Connect
one hot (black) wire from the wall switch to the yellow wire from the fan (this is the fan
control). Connect second hot (red) wire from the wall switch to the red wire from the fan
(this is the heat control). Connect the third hot (blue) wire from the wall switch to the
blue wire from the fan (this is the light control). Connect the ground wire from the house
to the green wire from the fan
(Figure 9)
. Use approved methods for all connections.
3. Reinstall the wire compartment cover by sliding the tabs at the bottom of the cover into
the slots in the housing. Make sure all wires are tucked inside of the compartment and
are not being pinched or showing through. Reinstall the two screws removed in
Step 3
of
SECTION 1
Preparing the Unit
(Figure 10)
.
www.airkinglimited.com
964 Rev. A 8-15
3 of 12
SECTION 6
Completing the Installation
1. Insert the plug from the heating unit into the receptacle marked“HEAT”, and the plug
from the fan into the receptacle marked “VENT”(
(Figure 11).
2. Remove grill from carton and open light lens area by pushing in on the two tabs of the
light lens and pulling outward from lens. The lens will swing open on the connector bars.
DO NOT remove the lens from the grill
(Figure 12).
3. Install light reflector into grill by lining up the posts on grill with the holes in light reflector
(Figure 13)
. Raise light reflector and grill up to housing and insert plug from light into
receptacle marked “LIGHT” (located on the side of the wire compartment)
(Figure 11).
4. Attach light reflector in place with the two screws removed during
Step 2
in
SECTION 1
Preparing the Unit
so grill fits snuggly against ceiling
(Figure 14).
Figure 8
Figure 10
Slot
Light
Tab
Figure 11
Vent
Heater
Hot (Blue)
Figure 9
White
Ground
Hot (Red)
Hot (Y
ello
w)
Supply from house
Figure 12
Connector
Bar
Tabs
Post
Hole
Post
Figure 13