Air King AK964 Скачать руководство пользователя страница 3

SECTION 4

Ducting

CAUTION: 

ALL DUCTING MUST COMPLY WITH LOCAL AND NATIONAL 

BUILDING CODES.

1.  Remove any tape that might be holding the damper in place. Connect the ducting to the 

fan’s duct collar 

(Figure 8)

 and secure in place using tape or screw clamp. Always duct 

the fan to the outside through a wall or roof cap.

SECTION 5

Wiring

CAUTION:

 MAKE SURE POWER IS SWITCHED OFF AT SERVICE PANEL BEFORE 

STARTING INSTALLATION.

WARNING:

 THIS UNIT MUST BE WIRED ON A SEPARATE 20 AMP CIRCUIT.

WARNING:

 

USE APPROPRIATELY SIZED COPPER CONDUCTORS ONLY RATED 

FOR AT LEAST 75°C.

CAUTION:

 ALL ELECTRICAL CONNECTIONS MUST BE MADE IN ACCORDANCE 

WITH LOCAL CODES, ORDINANCES, OR NATIONAL ELECTRICAL CODE. IF YOU ARE 

UNFAMILIAR WITH METHODS OF INSTALLING ELECTRICAL WIRING, SECURE THE 

SERVICES OF A QUALIFIED ELECTRICIAN.

1.  Run wiring from approved wall switches carrying the appropriate rating. One neutral 

(white), one ground (green or bare copper), and three hot (black, red, blue leads 
connected to the switch, one for each function). Secure the electrical wires to the 
housing with an approved electrical connector. Make sure you leave enough wiring in 
the box to make the connection to the fan’s receptacles.

2.  Connect the white wire from the house to the three white wires from the fan. Connect 

one hot (black) wire from the wall switch to the yellow wire from the fan (this is the fan 
control). Connect second hot (red) wire from the wall switch to the red wire from the fan 
(this is the heat control). Connect the third hot (blue) wire from the wall switch to the 
blue wire from the fan (this is the light control). Connect the ground wire from the house 
to the green wire from the fan 

(Figure 9)

. Use approved methods for all connections.

3.  Reinstall the wire compartment cover by sliding the tabs at the bottom of the cover into 

the slots in the housing. Make sure all wires are tucked inside of the compartment and 
are not being pinched or showing through. Reinstall the two screws removed in 

Step 3

 

of 

SECTION 1

 

Preparing the Unit

 

(Figure 10)

.

www.airkinglimited.com

964 Rev. A 8-15

3 of 12

SECTION 6

Completing the Installation

1.  Insert the plug from the heating unit into the receptacle marked“HEAT”, and the plug 

from the fan into the receptacle marked “VENT”( 

(Figure 11).

2.  Remove grill from carton and open light lens area by pushing in on the two tabs of the 

light lens and pulling outward from lens. The lens will swing open on the connector bars. 
DO NOT remove the lens from the grill 

(Figure 12). 

3.  Install light reflector into grill by lining up the posts on grill with the holes in light reflector 

(Figure 13)

. Raise light reflector and grill up to housing and insert plug from light into 

receptacle marked “LIGHT” (located on the side of the wire compartment) 

(Figure 11).

4.  Attach light reflector in place with the two screws removed during 

Step 2

 in 

SECTION 1

 

Preparing the Unit

 so grill fits snuggly against ceiling 

(Figure 14).

Figure 8

Figure 10

Slot

Light

Tab

Figure 11

Vent

Heater

Hot (Blue)

Figure 9

White

Ground

Hot (Red)

Hot (Y

ello

w)

Supply from house

Figure 12

Connector 

Bar

Tabs

Post

Hole

Post

Figure 13

Содержание AK964

Страница 1: ...tandards including fire related construction b For supply connections use wires suitable for at least 75 C 167 F c Use copper wire only d Sufficient air is needed for proper combustion and exhausting...

Страница 2: ...New Construction 1 Mounting Rail Installation Install the rails on the housing and position the housing next to the joist Line up housing so it will be flush with the finished ceiling Secure the ends...

Страница 3: ...the fan this is the heat control Connect the third hot blue wire from the wall switch to the blue wire from the fan this is the light control Connect the ground wire from the house to the green wire f...

Страница 4: ...le on grill or every 6 months 1 Cleaning the Grill Reverse the instructions in Section 6 Completing the Installation to remove grill Use a mild detergent such as dishwashing liquid and dry with a soft...

Страница 5: ...s to Air King for repair or replacement Air King will pay return shipping charges from Air King following warranty repairs or replacement ANY AND ALL WARRANTIES EXPRESSED OR IMPLIED INCLUDING WITHOUT...

Страница 6: ...www airkinglimited com 964 Rev A 8 15 6 of 12 NOTES...

Страница 7: ...es incluant la construction relative aux incendies b Pour les connexions d alimentation utilisez des c bles adapt s au moins 75 C 167 F c Utilisez des c bles en cuivre seulement d De l air en quantit...

Страница 8: ...es 4 traverses de montages fournies 5 Enlever l alv ole d fon able l aide d un tournevis plat Figure 3 SECTION 2 Nouvelle Construction 1 Installation des Traverses de Montage Installer les traverses s...

Страница 9: ...our le contr le du ventilateur Connecter le second fil vivant rouge de l interrupteur mural au fil rouge du ventilateur contr le du chauffage Connecter le troisi me fil vivant bleu de l interrupteur m...

Страница 10: ...nettoy s lorsque l accumulation de la poussi re devient visible sur le gril ou tous les 6 mois 1 Nettoyage de la grille Inverser les instructions dans la Section 6 Compl ter l installation pour enleve...

Страница 11: ...tion d abus de mauvaise utilisation de r paration faite ou tent es non autoris es Cette garantie ne couvre pas les co ts d exp dition pour le retour des produits Air King pour la r paration ou le remp...

Страница 12: ...www airkinglimited com 964 Rev A 8 15 12 of 12 NOTES...

Отзывы: