background image

www.airdryclotheslines.com.au 

 

  

 

 

Step 6: 

Attaching the twin fold unit 

 

 

2 x 110mm bolts 

 

2 x 90mm bolts 

 

4 x nuts 

 

4 x washers 

 

New long spreader bar (Step 4) 
 

Make sure that the wall side sticker is facing away from 
you and place it up to the first post. Take the 110mm bolt 
with a washer and insert it through the top hole of the 
arm assembly and through the post. Lift one end of the 
long spreader bar and place it onto the bolt and secure 
with a nut. Take the 90mm bolt with the washer, place it 
through the bottom hole on the arm assembly then 
through the post and secure with a nut.  

Repeat with the opposite arm assembly. Measure the distance between the top of the posts and the 
bottom of the post and make sure this is the same and parallel. Adjust if needed. 

 
Step 7: 

Assembling the front bars

 

Inner frame:

 Place the small spreaders 

on the ground. Insert the 2 spreaders 
into each end of the joiner to make 
one long bar. Place each end of the bar 
into the ends of the 750 inner frame 
arms. 

Outer Frame:

 Place the large 

spreaders on the ground. Insert the 2 
spreaders into each end of the joiner 
to make one long bar. Place each end 
of the bar into the ends of the 1500 
outer frame arms. 

 

 

Содержание Twin Fold Ground Mounted

Страница 1: ...Twin Fold Ground Mounted Clothesline Assembly instructions ...

Страница 2: ...se to acquaint yourself before starting the assembly and use of the clothesline Assembly instructions Open packaging and check off contents Do NOT open the arm assembly until they are mounted to the wall posts Parts A 2 x Posts B 1 x Left Arm Assembly C 1 x Right Arm Assembly D 2 x 750 arms E 4 x long spreaders F 2 x Short Spreaders G 3 x Small Joiners 2400 width clotheslines only H 3 x Large Join...

Страница 3: ...nd and mark the location for the second post Step 2 At these marked locations dig 2 holes 200mm diameter for the posts The hole depth depends on the desired height of the clothesline Standard posts are 2150 in length Standard height above ground is 1800 Leg extension kits are available if extra height is required or if installation is on sloped land Otherwise add 50 100mm to the height of the user...

Страница 4: ...ve the ends with the holes outside and facing the same direction Step 5 Assembly 2 x Twin fold arm assemblies 2 x 750 arms Place the arm assemblies on the ground with the wall side sticker facing the ground Undo the nut at the top of the assembly and thread the 750 arm onto the bolt Make sure the arm is facing the same direction as the outer 1500 arm Secure with the nut Tighten with the 13mm spann...

Страница 5: ...it through the bottom hole on the arm assembly then through the post and secure with a nut Repeat with the opposite arm assembly Measure the distance between the top of the posts and the bottom of the post and make sure this is the same and parallel Adjust if needed Step 7 Assembling the front bars Inner frame Place the small spreaders on the ground Insert the 2 spreaders into each end of the join...

Страница 6: ...the struts and lower the frame lift the bar evenly from the centre until both struts click and lower the frame Please note if the front bar is lifted in an uneven manner both struts will not engage If this happens reset by disengaging the strut and lower the frame Start the process again making sure to place your hands directly in the centre and lifting evenly Warning Do not continue to lift the b...

Страница 7: ...les have been occupied leaving 300mm at the end for tying off on completion Once all holes have been threaded bring each end of the cord around from the bottom of the frame around to the outside of the frame Place the cord under the previous line of cord and bring back to the outside of the frame to create an anchor tie off point See figure 9b Starting from the front of the clothesline place your ...

Страница 8: ... adjustment may be needed Raising and lowering the post height can be done by lifting and packing concrete as needed Vertical checks Place the spirit level on front rear side of the post and also sides of the posts and make sure level Repeat concrete packing method for adjustments Once clothesline is installed and square fill the remainder of the holes with mixed concrete Leave clothesline in the ...

Отзывы: