![Aiphone GF-1D Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/aiphone/gf-1d/gf-1d_installation-manual_2872611005.webp)
MOUNTING
- 5 -
¥ GF-BC, GF-VBC
¥ GF-1D
1. Loosen a screw on front case.
Lift the front case off the chassis, and pull it away.
2. Mount chassis on box.
3. Connect incoming wires on terminal block.
4. Remount front case on chassis, tightening the screw.
1. Attach the mounting bracket to single-gang box.
2. Connect wires, and remount terminal block.
3. Mount GF-1MD on mounting bracket.
Handset
Service button
Light button
Door release
button
Service button
Light button
Door release
button
To detach;
Slide and pull out the
terminal block.
Unplug
Cable
inlet hole
Chassis
Single-gang box
Single-gang box
Mounting bracket
83.5mm
(3-5/16")
*2
*1
83.5mm
(3-5/16")
60mm
(2-3/8")
Modular
plug
Plug in
or round gang-box
*3
*1
It is suggested to mount the station at the height of 150cm (5') from the floor.
Screw
Notes;
*
1: Cut out a hole for surface cable run.
*
2: Terminal block & switch for SERVICE button
are optional.
*
3: To avoid pinching, keep wires away from PC
board section.
Mounting rail
GF-BC, GF-VBC
Power on LED
(green)
Power
switch
Green LED lit
GF-BC,GF-VBC
Power
switch
Screw (x2)
ON
OFF
HOW TO RESET BREAKER (Power switch)
When system malfunctions, check the wiring. Check the fuse of power supply.
Turn off the power switch of GF-BC & GF-VBC and turn on after 4 seconds.
Resets the whole system.
Handset
Modular
plug
Screw
Plug
in
It is suggested to mount the station so that the video monitor comes at the user's eye level.
¥ GF-1MD
60mm
(2-3/8")
or round gang-box
Mounting rail for GF-
BC, GF-VBC & GF-4Z:
W-DIN11 available
from Aiphone
Note;
Strip jacket of cables, and put all the wires neatly into
slot, otherwise damages the wires by pinching.