background image

11

www.

A

imscorp.net

2

.

Once legs are secure, ensure the legs and uprights are aligned  before installing the cross rails.

Содержание PV6X120RACK

Страница 1: ...Ground Mounting System I Installation Manual PV6X120RACK PV6X250RACK...

Страница 2: ...lar products specializing in PV mounting systems We have been providing products for back up and off grid power applications for over 20 years AIMS Power has DC to AC power inverters deep cycle batter...

Страница 3: ...liding motion The racking system includes pre assembled legs that unfold quickly allowing for easy bolt connection minimizing labor Various types of bases may be used Check with local regulatins When...

Страница 4: ...udes a 25 year warranty Compliant with the following standards GB50009 2001 GB50011 2001 GB T 13912 92 GBT 14846 2008 GB T 6892 2006 GB50429 2007 GB50017 2003 AS NZS 1170 ASCE SEI 7 05 ASCE SEI 7 010...

Страница 5: ...rack from the front PV6X120RACK PV6X250RACK 86 5 8 14 1 2 53 3 8 35 1 4 60 7 8 125 7 8 23 1 4 67 3 8 48 5 8 75 1 2 87 L x 4 1 2 H x 2 1 4 W 126 L x 3 7 8H x 2 3 8 W PV6X120RACK RAIL PV6X250RACK RAIL...

Страница 6: ...hor studs with Ramset Chemset REO502 chemical injection anchoring system Minimum anchor embedment depth of 90mm with concrete strength of 32MPa There are several ways to mount the racks depending on a...

Страница 7: ...m spacing between legs Features 25 years Type 2 Ordinary 1 250 2 20 Design Life Importance Level Annual Probability of Exceedance Terrain Category to AS1170 2 Maximum Pitch Aluminum Rails Maximum Sola...

Страница 8: ...T5 Includes Quantity 9 a A2 70 M8 Hexagon screw b Aluminum fixing nut 3 Mid Clamp AL 6005 T5 Includes Quantity 9 a A2 70 M8 Hexagon screw b Aluminum fixing nut 4 HD Rail Clamp AL 6005 T5 Includes Qua...

Страница 9: ...9 www Aimscorp net Installation Steps 1 Unfold the pre assembled leg and connecting upright Fasten the base of the legs to the attached anchor bolts Tighten all anchor bolts to secure leg and upright...

Страница 10: ...10 www Aimscorp net...

Страница 11: ...11 www Aimscorp net 2 Once legs are secure ensure the legs and uprights are aligned before installing the cross rails...

Страница 12: ...f the rails on the upright To assist installers the bottom rail clamps are pre assembled in the recommended position Adjust as required L Solar Panel length 4 Place the rails on the pre assembled legs...

Страница 13: ...13 www Aimscorp net...

Страница 14: ...rails 6 Use end clamps with M8 25 Hexagon screws and fixing nuts to attach solar panels to the rails Adjacent solar panels are attached by using mid clamps with M8 Hexagon screws The hexagon screw len...

Страница 15: ...15 www Aimscorp net...

Страница 16: ...16 www Aimscorp net 8 Repeat steps until installation is completed AIMS POWER 9550 Gateway Drive Reno NV 89521 Tel 775 359 6703 Fax 775 359 6753 Email sales aimscorp net techsupport aimscorp net...

Отзывы: