background image

- 7 - 

Installing the Power Supply Unit 

Once the top cover have been removed, a user supplied PSU can be installed. The PSU is 

installed at the rear of the chassis and secured to the chassis with four retention screws. To 

install the PSU, please follow the steps below: 

 

1.  Correctly position the PSU at the 

rear of the chassis with the power 

switch and cable socket both 

facing outwards. Secure the PSU 

by inserting four retention screws 

through the rear of the chassis   

 

 

  Compatible Power Supply Unit models are available in Appendix A. 

 

Installing the Hard Disk Drive 

The RCK-203BE chassis supports one 5.25" and one 3.5

” external drives bays. To install 

the drives, please follow the steps outlined in the sections below. 

 

1.  Remove the four screws and pull upside to 

remove the HDD bracket from the chassis 

 

3. 

For installing 5.25” drive, remove the four 

retention screws for each bay as indicated by 

red circles. Then insert the drive and secure 

retention screws as indicated by black circles. 

 

4.  After the 5.25

” or 3.5” drives assembled to the 

bracket, place back to the chassis, and secure 

with crews. 

 

2. 

For installing 3.5” drive, remove 

the four retention screws for 

each bay as indicated by blue 

circles. Then insert the drive 

and secure retention screws as 

indicated by green circles 

 

 

Содержание RCK-203BE

Страница 1: ...RCK 203BE Rackmount Chassis User Manual...

Страница 2: ...oduced copied or translated without prior notice to AICSYS Inc RCK 203BE is trademark of AICSYS Inc Disclaimer Specification and information contained in this manual are provided for reference only We...

Страница 3: ...Tools 5 Recommended Working Environment 5 Chassis Mechanical Drawing 5 Chapter 2 Installation Guide 6 Unpacking the Chassis 6 Removing the top cover 6 Installing the Power Supply Unit 7 Installing the...

Страница 4: ...1 3 5 internal drive Cooling fan 2 80mm high speed ball bearing fans Switch On Off switch and Reset switch Indicator Power On Off HDD activity LEDs I O 2 USB and 1 PS 2 Expansion 5 x full height expan...

Страница 5: ...ver Flat Head Screwdriver Forceps for pulling out jumpers and screws Recommended Working Environment A flat anti static work surface is required when assembling a complete system Chassis Mechanical Dr...

Страница 6: ...bove are present Make sure the chassis has not been damaged in anyway The installation steps outlined above are described in details below Please refer to the relevant section s Removing the top cover...

Страница 7: ...lling the Hard Disk Drive The RCK 203BE chassis supports one 5 25 and one 3 5 external drives bays To install the drives please follow the steps outlined in the sections below 1 Remove the four screws...

Страница 8: ...backplane may have different Screw hole positions please refer to their own User manual for details Compatible backplane models are available in Appendix B Installing the CPU Card To install the CPU...

Страница 9: ...Compatible Power Supply Units are listed in the table below Model number Wattage Type Dimension W x H x L SS 400ES 400W Single output 150 x 140 x 86mm SS 600ES 600W Single output 150 x 140 x 86mm App...

Страница 10: ...10 The Global Choice for Premium Industrial Computer Products www aicsys com...

Отзывы: