background image

4

1 - Ratings & Data - Natural Gas & Propane Gas ...........................................................2
2 - Dimensions .............................................................................................................3
3 - Installation Procedure ............................................................................................6
4 - Ventilation & Combustion Air ..................................................................................7
5 - Connecting Supply & Return Piping .........................................................................8
6 - Vent Installation ...................................................................................................14

7 - Vent System Modification

 ......................................................................................14

8 - Vent Damper Installation & Instructions ...............................................................15
9 - Connecting Gas Service .........................................................................................16
10 - Electrical Section .................................................................................................17
11 - Wiring Diagram ...................................................................................................18
12 - Lighting Instructions ...........................................................................................20
13 - Normal Sequence Of Operation ...........................................................................21
14 - General Instructions ...........................................................................................21
15 - Checking Gas Input Rate To Boiler ......................................................................23
Appendix A - Control Module

 .....................................................................................

24

A.1 Installation Environment Considerations ................................................................

24

A.2 Electrical Connections .........................................................................................

24

A.3 Adjusting Settings ..............................................................................................

24

A.4 Display .............................................................................................................

24

A.5 Operation .......................................................................................................... 25
A.6 Boiler High Limit Temperature Controller ................................................................

26

A.7 Troubleshooting..................................................................................................

26

A.8 Troubleshooting Error Codes ................................................................................

26

A.9 Intermittent Pilot Ignition System Verification ......................................................... 27

TABLE OF CONTENTS

P/N IM-BWBB-01

[240011111 REV B, 06/30/2016]

Содержание BWBBAN000045

Страница 1: ...r Forced Hot Water INSTALLATION OPERATION MAINTENANCE MANUAL Models BWBBAN000045 BWBBAN000070 BWBBAN000096 BWBBAN000120 BWBBAN000145 BWBBAN000170 BWBBAN000195 BWBBAN000245 BWBBAN000295 P N IM BWBB 01 240011111 REV B 6 30 2016 ...

Страница 2: ...selected on basis of its heating capacity 3 Tank sized for non ferrous baseboard or radiant panel systems Increase size for cast iron baseboard and radiation STANDARD EQUIPMENT Boiler Jacket Cast Iron Boiler Battery High Limit Control Intermittent Electric Ignition Pilot System Vent Damper Relay Circulator With Return Piping To Boiler Main Gas Burners Gas Control Includes Automatic Gas Valve Gas P...

Страница 3: ...2015 16 415 16 1 BWBBAN000096 15 7 5 28 2015 16 415 16 1 BWBBAN000120 19 9 6 29 217 16 57 16 1 BWBBAN000145 19 9 6 29 217 16 57 16 1 BWBBAN000170 22 113 16 7 30 2115 16 515 16 1 BWBBAN000195 22 113 16 7 30 2115 16 515 16 1 BWBBAN000245 26 136 16 8 31 227 16 615 16 1 BWBBAN000295 30 155 16 9 32 2215 16 815 16 1 Propane Gas Inlet All Units 1 2 2 DIMENSIONS Dimensions Minimum Height for Low Water Cut...

Страница 4: ...m 18 12 Lighting Instructions 20 13 Normal Sequence Of Operation 21 14 General Instructions 21 15 Checking Gas Input Rate To Boiler 23 Appendix A Control Module 24 A 1 Installation Environment Considerations 24 A 2 Electrical Connections 24 A 3 Adjusting Settings 24 A 4 Display 24 A 5 Operation 25 A 6 Boiler High Limit Temperature Controller 26 A 7 Troubleshooting 26 A 8 Troubleshooting Error Code...

Страница 5: ...he boiler room Modification substitution or elimination of factory equipped supplied or specified components may result in personal injury or loss of life TO THE OWNER Installation and service of this boiler must be performed by a qualified installer TO THE INSTALLER Leave all instructions with boiler for future reference When this product is installed in the Commonwealth of Massachusetts the inst...

Страница 6: ...ervice circulator replacement condensate trap control replacement etc 6 Locate boiler on level solid base as near chimney as possible and centrally located with respect to heat distribution system as practical 7 Allow 24 inches 610mm at front and right side for servicing and cleaning 8 When installed in utility room door should be wide enough to allow largest boiler part to enter or to permit repl...

Страница 7: ...ate is less than 0 40 air changes per hour See Table 3 for space with boiler only Use equation for multiple appliances Volume 50 ft3 x Total Input Mbh о о Known Air Infiltration Rate See Table 3 for space with boiler only Use equation for multiple appliances Do not use an air infiltration rate ACH greater than 0 60 Volume 21 ft3 ACH x Total Input Mbh о о Refer to National Fuel Gas Code for opening...

Страница 8: ... than that of the relief valve outlet over the entire length of discharge line have no intervening shutoff valve between safety relief valve and discharge to atmosphere do not plug or place any obstruction in discharge line terminate freely to atmosphere where any discharge will be clearly visible and at no risk of freezing allow complete drainage of the valve and the discharge line be independent...

Страница 9: ...ef valve Systems with automatic fill valves require back flow prevention device Install discharge piping from safety relief valve See Warning Page 8 When boiler is connected to heating system utilizing multiple zoned circulators each circulator must be supplied with flow control valve to prevent gravity circulation Hot water boilers and system must be filled with water and maintained to minimum pr...

Страница 10: ...RCULATOR A PRESSURE REDUCING VALVE PROPER BACKFLOW PROTECTION DEVICE GATE VALVE PURGE VALVE NOTICE Circulators in following illustrations are mounted on system supply side mounting on system return side is also acceptable practice Figure 2 Circulators Mounted on Supply System Boiler Used In Configuration to Chiller System See Special Conditions Page 9 P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 11: ...ge 9 5 CONNECTING SUPPLY AND RETURN PIPING Figure 3 Bypass Piping Automatic Mixing Valve See Bypass Piping Options Page 9 BOILER WATER INLET ALTERNATE CIRCULATOR LOCATION TO SYSTEM FROM SYSTEM CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE 3 WAY MIXING VALVE AIR SEPARATOR HOSE BIB EXPANSION TANK Note Bypass connection not showing primary secondary piping Note Bypass connec...

Страница 12: ...12 5 CONNECTING SUPPLY AND RETURN PIPING Figure 5 Single Zone System With DHW Priority Figure 6 Multi Zone System with Circulators and DHW Priority P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 13: ...UPPLY AND RETURN PIPING Figure 7 Multi zone System With Zone Valves And DHW Priority With Circulator Figure 8 Multi zone System With Zone Valves And DHW Priority With Zone Valve P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 14: ...of the common venting system the common venting system should be re sized to approach the minimum size determined using the appropriate tables in Chapter 13 of the National Fuel Gas Code ANSI Z223 1 NFPA 54 and or the Natural Gas and Propane Installation Code CAN CSA B149 1 1 Vent pipe must slope upward from boiler not less then inch per 1 foot to the vent terminal 2 Horizontal portions of venting...

Страница 15: ...visible location following installation 5 Thermostat s heat anticipator must be adjusted to match total current draw of all controls associated with boiler during heating cycle 8 VENT DAMPER INSTALLATION INSTRUCTIONS Figure 9 Damper Installation Figure 10 Damper Location NOTE Refer to Figure 9 for steps 1 6 1 Place Vent Damper on or as close to vent outlet of boiler as possible Do not modify draft...

Страница 16: ...with hooks straps bands brackets hangers or building structure components to prevent or dampen excessive vibrations and prevent strain on gas connection Boiler will not support piping weight Use thread joint compound pipe dope suitable for liquefied petroleum gas Install field sourced manual main shutoff valve ground joint union and sediment trap upstream of gas valve See Figure 11 Table 5 Gas Pre...

Страница 17: ...nection 4 Line power connections 5 LWCO kit 550002998 includes wiring instructions and wiring diagrams If using a different LWCO refer to the specific instructions provided with that unit See wiring diagrams on the following two pages for details Thermostat Installation 1 Install thermostat on inside wall about four feet above floor 2 NEVER install thermostat on outside wall 3 Do not install a the...

Страница 18: ...tegrated High Limit Electronic Ignition Control WARNING Modification substitution or elimination of factory equipped supplied or specified components may result in personal injury or loss of life P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 19: ...19 11 WIRING DIAGRAM Figure 13 Integrated High Limit Electronic Ignition Control P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 20: ...as To Appliance and call qualified service technician or your gas supplier TO TURN OFF GAS TO THE APPLIANCE 1 Set the thermostat to lowest setting 2 Turn off all electric power to the appliance if service is to be performed 3 Push in gas control knob slightly and turn clockwise to OFF DO NOT FORCE 4 Call qualified service technician WARNING If you do not follow these instructions exactly a fire or...

Страница 21: ... maintain circulators Refer to circulator manufacturer s instructions Inspect venting system at the start of each heating season Check vent pipe from boiler to chimney for signs of deterioration by rust or sagging joints Repair if necessary Remove vent pipe at base of chimney or flue and using mirror check vent for obstruction and verify vent is in good working order Inspect boiler flue gas passag...

Страница 22: ... corrosion rust or scale buildup Area around boiler must be kept clear and free of combustible materials gasoline and other flammable vapors and liquids Free flow of combustion and ventilating air to boiler and boiler room must not be restricted or blocked Inspect field sourced low water cutoffs annually or as recommended by low water cutoff manufacturer Flush float type low water cutoffs per manu...

Страница 23: ...column from specified pressure Primary air adjustment is not necessary therefore air shutters are not furnished as standard equipment Air shutters can be furnished on request where required by local codes or conditions CHECK SAFETY CONTROL CIRCUIT Ignition system safety shutoff device must be tested after placing boiler in operation Intermittent Pilot With main burner operating turn pilot gas adju...

Страница 24: ...r to enclosed addendum for wiring instructions when using indirect hot water heater Verify vent damper connection is made See page 15 A 3 Adjusting Settings To discourage unauthorized changing of settings procedure to enter adjustment mode is required To enter adjustment mode press UP DOWN and I buttons simultaneously for three seconds Press and release I button until parameter requiring adjustmen...

Страница 25: ...ropriate alarm is sent OR Flame signal sensed out of sequence during post purge Appropriate alarm is sent OR Flame signal present when not expected Appropriate alarm is sent 17 Pilot valve diagnostics Pilot valve circuitry diagnostics during pre purge Current leakage detection Self check performed at start up again at beginning of heat cycle and during Wait for Recovery State Wait for recovery Sel...

Страница 26: ...at thermostat Check for correct installation and wiring before replacing any component Control module cannot be repaired If it malfunctions it must be replaced Use only qualified service agent to service ignition systems 1 Perform checkout as first step in troubleshooting 2 Check troubleshooting guide to pinpoint cause of problem See Table 7 page 27 3 If troubleshooting indicates ignition problem ...

Страница 27: ...rs 63 Soft lockout maximum number of recycles exceeded After main burner ignition Soft lockout 64 Soft Lockout electronics failure On board self diagnostics detected error Soft lockout 65 Over temperature error Sensor measured temperature in excess of maximum allowable limit Hard lockout Note Soft lockout time is 1 hour or manual reset Hard lockout requires manual reset Wait for recovery normal op...

Страница 28: ...r cracked ceramic insulator which can cause short to ground and replace igniter sensor if necessary At gas valve disconnect main valve wire from MV terminal Turn on power and set thermostat to call for heat Pilot should light main burner will remain off because main valve actuator is disconnected Check pilot flame Verify it is blue steady and envelops 3 8 to 1 2 in 10 to 13 mm of flame rod Figure ...

Страница 29: ...29 NOTES P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 30: ...30 NOTES P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 31: ...31 Company Address Phone Company Name Tech Initials Service Performed Date SERVICE RECORD P N IM BWBB 01 240011111 REV B 06 30 2016 ...

Страница 32: ... an override which is provided primarily to permit the use of an external energy management system that serves the same function THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE An external energy management system is installed that reduces the boiler water temperature as the heating load decreases This boiler is not used for any space heating This boiler is p...

Отзывы: