background image

Installation-, Operating-, Maintenance-Manual, Spare Part List 

BCR04 

 

 

 

 

AGT-PSG GmbH & Co.KG 

Errors and printing mistakes excepted 

Page 3 

Translation - Manual BCR04 Rev. 6/2017 

 

 

Introduction

 

 

Dear Customer,

 

 
Thanks that you have decided to buy our BCR03 sample gas cooler. You have chosen one of the most 

progressive appliances, which will facilitate a durable and trouble-free operation, if installation and 

operating is correct. 

 

 

 

 

 

Before installation and initial operation, please read the following instructions very carefully 

and follow our indications! Only if you observe our regulations and instructions for the 

sample gas cooler, a perfect functioning and so, a reliable compressed air conditioning will 
be guaranteed. Installation and initial start of operation has to be done through qualified and 

skilled staff only, and under usual proceedings within the gas analysis technology. Here from 

resulting general rules for the proper installation and operation could possibly not be taken 
completely into this instruction. We are not liable for non appliancespecific regulations and 

instructions. If statements in this instruction are contrary to legal or other valid regulations, 

so they have to be replaced accordingly. Other statements remain untouched. Due to the 

continuous technical evolution, we reserve the right to introduce any necessary change 
without giving previous notice. 

 

 

This manual must be maintained available in any moment for future references and 
it has to be intended as inherent part of the sample gas cooler. 

 

These operating instructions must be continuously available at the site where the sample gas 
cooler is used. We recommend to prepare a copy and keep the same in a safe and freely 

available place next to the sample gas cooler. Keep the original document in a safe place. 

 

 

Notes on supplementary documents: Supplementary documents such as operation manuals 
for options or pertaining components must always be heeded. They contain additional 

information, e.g. regarding maintenance, and are therefore necessary for safe operation of 

the plant.

 

 

 

Target Groups of these Operating Instructions

 

 

 

 

 

These operating instructions are intended for all persons working on and using the sample gas 

cooler. We assume that all such persons are specialist personnel, e.g. electricians, analysis or 
cooling technicians, respectively instructed personnel. 

 

We assume the following points: 

 

 

There are appropriate operating instructions for the application intended by the 

operator. 

 

The staff has been instructed how to handle the sample gas and is aware of the 

involved risks and the general danger prevention measures. 

 

The staff has experience in handling sample gas as well as in handling electrical and 

refrigerated devices. 

 

Содержание PSG BCR04

Страница 1: ...BCR04 Sample Gas Cooler Installation Manual Operating Manual Maintenance Manual Spare Part List...

Страница 2: ...nt and 93 68 EWG CE marking guideline It corresponds to the essential requirements of these guidelines The following harmonized standards in actual revision have been used DIN EN ISO 12100 1 2 securit...

Страница 3: ...ntinuous technical evolution we reserve the right to introduce any necessary change without giving previous notice This manual must be maintained available in any moment for future references and it h...

Страница 4: ...s damages caused by improper installation damages cause by improper use or overload of the cooler damages cause by lack of service damages caused by events which are not within the sphere of influence...

Страница 5: ...system After this through well experienced staff according DIN EN 378 The operator of the sample gas cooler must keep it in good condition operate it correctly monitor and maintain it regulary Safety...

Страница 6: ...and protected site at a temperature of 2 65 C and a non condensing specific humidity of 20 80 Should the stocking time exceed 6 months please contact the manufacturer NOTICE Recycling The packaging m...

Страница 7: ...ot possible With the mounting rails the cooler can be additionally fixed to the wall The wall has to be perfect vertical Ideally you use the optional console set of the manufacturer or a comparable co...

Страница 8: ...ter Installation Site Fasten mounting rails 1 and 2 in perfect vertical position at the wall The fastening points 2 und 4 need an exact distance of 400mm Mount the console rails 5 and 6 with identical...

Страница 9: ...S316 and provides 1 2 gaspaths The following feed lines must be connected Sample gas pipelines to the gas inlet connections Analyzers to the gas outlet connections Condensate pumps tanks to the conden...

Страница 10: ...neumatically tight drainage eg peristaltic pump float drain condensate tank etc For each gas path and condensate outlet a separate drain must be provided Without suitable condensate drainage the devic...

Страница 11: ...c start After you built up the electrical connections the cooler can start automatically The sample gas cooler has to be installed as shown at the circuit diagram The cross section of the power supply...

Страница 12: ...p can be different Please check the exact labeling of the contact strip before connecting components Conntecting the contact strip Contact 11 13 Operational monitoring of moisture guard 2 optional Con...

Страница 13: ...uous condensate removal Synchronuous motor gearbox with return stop Slow speed hose with long service life Can operate in any installed position Electronic Control Unit optional The electronic control...

Страница 14: ...owntime and high repair costs In case of an alarm sample gas pumps can be switched off and shut off valves can be activated The moisture sensor operates according to the principle of electric conducti...

Страница 15: ...to avoid consequential damage First actions could be to switch off the sample gas flow and the main power connection Qualified personnel must perform the start up When installing and operating this eq...

Страница 16: ...power supply the cooler will start automatically Model type with on off switch Switch on the power supply Then switch on the on off switch of the cooler After switching on the on off switch the cooler...

Страница 17: ...as feed is stopped and the power supply is really switched off Unplug the sample gas cooler CAUTION Follow system and process specific safety measures System and process specific safety measures must...

Страница 18: ...s and the operational setting of the cooler ST710 has a three digit LED Display 5 buttons and 2 contact outputs CAUTION Warranty lost Any change of the original setup will lead to a total loss of warr...

Страница 19: ...ch off the dryer and restart it Button lock active NOTICE Temperature display A dew point within 0 C and 10 C displayed on the control unit is correct according to the possible working conditions gas...

Страница 20: ...pply replace fuse Defective refrigerant circuit Contact AGT Service Sample gas flow reduced or blocked Gas paths contaminated Contamination may occur due to dust or sublimate Ensure pre separation Gas...

Страница 21: ...with condensate pumps Check the function of the condensate pumps especially the condition of the pump hoses Maintenance monthly or every 3000 hours of operation Verify for tightness all the screws of...

Страница 22: ...nit The degree of contamination of the condenser can adversely affect the performance of the device Clean the air cooled condensers using a soft brush or do a very careful air cleaning Additional clea...

Страница 23: ...v 6 2017 Service Replacing the fuse optional The fuse holder of the device fuse is located beneath the temperature display The lock of the fuse holder is opened using a screwdriver in the anticlockwis...

Страница 24: ...belt 8 6406061 Heat Exchanger Article Description RI Flow Schema Artikel No Heat Exchanger PVDF Mono condensate outlet bottom 7 8410948 Heat Exchanger PVDF Mono condensate outlet top 7 8410943 Heat E...

Страница 25: ...with appropriate icons Fill in this form and the subsequent declaration of decontamination completely Send the device along with the forms DDP Delivery Duty Paid AGT PSG will only accept deliveries i...

Страница 26: ...he declaration to the packing Otherwise your repair cannot be processed Gevice Articlenumber Serialnumber Reason for return I herewith declare that the device specified above has been properly cleaned...

Страница 27: ...Installation Operating Maintenance Manual Spare Part List BCR04 AGT PSG GmbH Co KG Errors and printing mistakes excepted Page 27 Translation Manual BCR04 Rev 6 2017 Circuit Diagram 230V 50 60Hz...

Страница 28: ...Installation Operating Maintenance Manual Spare Part List BCR04 AGT PSG GmbH Co KG Errors and printing mistakes excepted Page 28 Translation Manual BCR04 Rev 6 2017 Circuit Diagram 115V 50 60Hz...

Страница 29: ...Installation Operating Maintenance Manual Spare Part List BCR04 AGT PSG GmbH Co KG Errors and printing mistakes excepted Page 29 Translation Manual BCR04 Rev 6 2017 RI Flow Schema...

Страница 30: ...tion pressure 1100kPa to low pressure evaporation pressure 210kPa This expanded and fluid refrigerant flows through the heat exchanger pipes 6 of the evaporator 5 By energy input of the exchangeable h...

Страница 31: ...temperature C 3 C 0 5 C Pmax with cond pump bar 1 5 Pmax without cond pump bar 2 5 2 0 100 0 2 5 100 0 Gas condensate connection mm DN 4 6 condensate outlet at bottom D12 Dead space ml 4 x 67 4 x 98 4...

Отзывы: