Document No.
Revision
-
VS PD03 Scroll Pump and Components Replacement
Page
9
of 17
699910017 A
4. Disconnect the two spade connectors (red arrow in Figure 8: Spade Connectors):
• Red/black
• Black/black
Figure 8: Spade Connectors
5. Use an Allen wrench to loosen valve from housing (blue arrow in Figure 8: Spade Connectors).
6. Mount the new valve and tighten.
7. Reconnect the two spade connections.
8. Attach the front cover and secure to the frame using existing hardware.
9. Attach the rear cover and secure to the unit using existing hardware.
10.Connect the power cord and power up the unit.
11. Watch the home screen to verify the
Spectube Pressure Wait
message progresses to
Stabilization Wait
and
System
Ready
within ten minutes.
Refer to the operator's manual if the system fails to reach the
System Ready
mode.
Содержание VS PD03
Страница 19: ......