1
17
Installation
Mounting front handles/flanges for rackmount
1.
In
st
a
llat
ion
Figure 1-4
Mounting the handle/rackmount kit
Mounting handle kit (Option 1CN)
The handle kit is a kit that contains a pair of front handles used to move/transport the
E5053A. Follow these steps to mount it, referring to the Figure 1-4.
Step 1.
Remove the trim strips (1) stuck to both the sides of the front panel (stuck to the frame).
Step 2.
Mount the front handles (3) to both the sides of the front panel of the E5053A with the
attached screws.
WARNING
If a front handle you mounted is damaged, replace it with new one immediately. If
you use a damaged front handle to move/transport the instrument, the handle may
break, which may injure the operator or break the instrument.
Содержание E5053-90020
Страница 6: ......
Страница 14: ...8 Contents...
Страница 18: ...12 1 Installation Incoming inspection Figure 1 1 Accessories...
Страница 27: ...1 21 Installation Power supply and fuse 1 Installation Figure 1 6 Power cable options...