30
Chapter 3
Operation Verification
Power Level Accuracy Check
Configure the Power Meter
1. Zero and calibrate the power meter to the sensor’s reference calibration factor.
2. Set the power meter to measure absolute log power (dBm).
Measure the Power Level Accuracy
1. Set the power levels and frequencies for the signal generator to the maximum signal generator frequency.
Refer to
Table 3-8, “Power Level Accuracy Setup 1,” on page 45
.
2. Set the power sensor’s calibration factor for each frequency.
3. Record the measured power level in
and compare it to the corresponding limits.
Connect the Test Equipment for Setup 2
Figure 3-3
Power Level Accuracy Equipment Setup 2
Configure the Signal Generator
1. Press
Frequency
. Enter 277 using the numeric keypad and press the
kHz
terminator softkey.
2. Press
Amplitude
. Enter
−
45 using the numeric keypad and press the
dBm
terminator softkey.
Содержание E4428C ESG
Страница 7: ...1 1 Safety Information ...
Страница 12: ...6 Chapter 1 Safety Information General Safety Considerations ...
Страница 13: ...7 2 Getting Started ...
Страница 28: ...22 Chapter 2 Getting Started Contacting Agilent Sales and Service Offices ...
Страница 29: ...23 3 Operation Verification ...
Страница 61: ...55 4 Regulatory Information ...
Страница 64: ...58 Chapter 4 Regulatory Information Regulatory Information misc ...