85056A
3-13
Use, Maintenance, and Care of the Devices
Gaging Connectors
l. Without turning the gage or the sliding load, loosen the connection between the gage
and the sliding load and remove the sliding load from the gage.
CAUTION
Remove the centering bead immediately after gaging the sliding load pin
depth. Damage can occur to the sliding load during the removal of a centering
bead that has slipped too far into the sliding load. The sliding load will not
perform to its specifications if the centering bead is not removed before an
electrical calibration is performed.
m. Carefully remove the centering bead from the sliding load. If the centering bead does
not come out of the sliding load easily:
i. Unlock the center conductor pullback handle and move the center conductor
pullback mechanism toward the connector end of the sliding load to extend the
center conductor.
ii. While holding the center conductor pullback mechanism toward the connector end
of the sliding load, remove the centering bead.
If the centering bead still will not come out:
i. Hold the sliding load with the connector end pointed downward.
ii. Move the sliding ring up, then quickly down. The trapped air behind the centering
bead should eject it.
Return the center conductor pullback mechanism to the rear of the sliding load and
return the pullback handle to its locked position.
Adjusting the Sliding Load Pin Depth
The sliding loads in this kit have a setback mechanism that allows the pin depth to be set
to any desired value. The pin depth of the sliding load is preset at the factory.
The pin
depth should not have to be reset each time the sliding load is used,
but it should be checked
before each use.
If the pin depth is outside the
observed
limits listed in
, use the
following procedure to reset it to the nominal value of
−
0.00381 mm (
−
0.00015 in).
This procedure assumes that you were directed here from
. If not, perform the steps in that procedure before performing this
procedure.
1. The gage should be attached to the sliding load. Refer to
if necessary.
2. The face of the gage and the label on the sliding load should be facing up.
3. The center conductor pullback handle should be in the locked position.
4. With a small screwdriver, gently turn the center conductor pin depth adjustment screw
until the gage pointer reads
−
0.00381 mm (
−
0.00015 in). Refer to
for the
location of the adjustment screw.
5. Wait approximately five minutes to allow the temperature to stabilize. Do not touch
either the gage or the sliding load during this time.
Содержание 85056A
Страница 4: ...iv ...
Страница 7: ...1 1 1 General Information ...
Страница 13: ...2 1 2 Specifications ...
Страница 19: ...3 1 3 Use Maintenance and Care of the Devices ...
Страница 21: ...85056A 3 3 Use Maintenance and Care of the Devices Electrostatic Discharge Figure 3 1 ESD Protection Setup ...
Страница 28: ...3 10 85056A Use Maintenance and Care of the Devices Gaging Connectors Figure 3 2 Gaging 2 4 mm Connectors ...
Страница 39: ...4 1 4 Performance Verification ...
Страница 42: ...4 4 85056A Performance Verification Recertification ...
Страница 43: ...5 1 5 Troubleshooting ...
Страница 47: ...6 1 6 Replaceable Parts ...
Страница 50: ...6 4 85056A Replaceable Parts Introduction Figure 6 1 Replaceable Parts for the 85056A Calibration Kit ...
Страница 51: ...85056A 6 5 Replaceable Parts Introduction Figure 6 2 Replaceable Parts for the 85056A Calibration Kit ...
Страница 52: ...6 6 85056A Replaceable Parts Introduction ...
Страница 53: ...A 1 A Standard Definitions ...
Страница 70: ...A 18 85056A Standard Definitions Nominal Standard Definitions ...