Assembling the A-Frame
4.22. Install the Tube Lift Cable
1. Wrap the cable (1) around the bottom side of the winch drum with three complete wraps around the drum
when conveyor is in transport position (see
Failure to follow could result in conveyor collapse and cause serious injury.
2. Thread cable onto drum and secure with spool anchor.
3. Run the cable towards the spout.
Æ
4.
For models with a hand winch:
Route the cable through the motor mount pipe (see
).
Note
If your model has a hydraulic winch, then the winch is mounted closer to the spout than the s-drive,
so routing the cable through the motor mount pipe is not necessary in that case.
5. Thread the cable through the slider pulley.
6. Run the cable from the slider pulley towards the hopper and stop at the cable attach (3).
7. Loop the cable under and around the cable attach and secure it with two 5/16" cable clamps (2).
8. Trim excess cable.
9. Test the function of the winch by lifting the conveyor to its raised position.