Stay ahead. With Agfa Global Services.
:Anapurna M
4F
- Operator Manual
Maintenance - Periodic Maintenance
55
The carriage will start moving up and move towards the Home Side; wait till the
booting process is complete
Clean the capping station and close the Capping Cover
Wait till the base plate temperature reaches 49° C
Open the Home Cover
Turn the Vacuum gauge to restore the negative vacuum to approx -.06
Switch all the 2-way ink valves to ‘I’ position, leave the solution valve at ‘I’
Perform a Long Purge (with intervals of 2 seconds ON and 4 seconds OFF) till ink
is coming out of the print heads
Take a new lint free cloth and clean the ink residue from the print heads (just a
gentle tap, no wiping)
Perform a PRIME TEST to check the print heads