background image

9     -     8 6 5 0   S E R I E S   S P R A Y E R S   O P E R A T I O N   &   M A I N T E N A N C E   M A N U A L

FIG. 17

If equipped with an automatic rate controller, a speed sensor is 

sent along in the controller kit. The sensor needs to be mounted 

to the cap or sprayer with a clear line of sight to the sky. The 

red wire will need to be hooked up to 12 volt power (TeeJet cal 

#1150. Raven cal # 586. See figure 17).

STEPS:

The front frame is designed with a fold up step on each side of 

the tongue for easy access to teh filling platform from either 

side. The steps need to be folded flat against the tongue when 

in transport or field operation (see figure 18).

FIG. 18

FIG. 19

OPTIONAL SPRAY

CONTROLLER SPEED SENSOR

1.  Start hyrdraulic pump and make sure you have at least 70 

P.S.I. on gauge. 

2.  Lower inductor tank by pulling pin in figure 19 and make 

sure valve 2 is closed (figure 10, page 10). 

3.  Turn Venturi valve (valve 1) on by turning handle down as 

pictured in figure 20 (page 10). 

4.  Fill tank with chemical to desired level. 

5.  Open valve on bottom of tank (valve 1) to move chemical 

from inductor tank to product tank 

(figure 10, page 10). 

6.  Flush tank by using small valve located on top of inductor 

tank (valve 2, figure 10, page 10). 

7.  Turn off Venturi. Valve & raise tank up to transport posi-

tion.

OPTIONAL INDUCTOR

TANK OPERATION

Содержание Schaben 8650 Series

Страница 1: ...274 1025 NEWTON KS 7000 SCHABEN CT 67114 800 394 7662 BAKERSFIELD CA 4450 STATE RD 93308 877 724 2236 TEMPE AZ 8464 S KYRENE RD 85284 877 974 7166 OTHELLO WA 81 E PINE ST 99344 800 634 2026 HOPKINSVI...

Страница 2: ...tight and that steel lines hoses and couplings are in good condition 17 Before applying pressure to chemical system make sure that all connections are tight and that all hoses and fittings are in good...

Страница 3: ...the sprayer looking toward the tractor locate the boom folding hydraulic block Locate the by pass dump valve see figure 4 on the right hand side and the by pass dump plug on left hand side Remove both...

Страница 4: ...FIG 4 FIG 3 OPEN CENTER SYSTEM CLOSED CENTER SYSTEM 3 8 6 5 0 S E R I E S S P R A Y E R S O P E R A T I O N M A I N T E N A N C E M A N U A L...

Страница 5: ...low position prior to operating The boom circuit only requires 3 gpm of hydraulic flow Set hydraulic flow accordingly increasing hydraulic flow will not speed up boom function Only reduce sprayer pump...

Страница 6: ...right outer boom in and down to extend Release the switch the right outer boom will stop moving and it will remain at that position 7 RIGHT BOOM EXTEND FOLD This spring loaded to neutral center switc...

Страница 7: ...O M 6 3 Push down inner fold switches to unfold inner wings Note On 90 foot models extend outer booms before inner wings are completely unfolded Failure to do so can cause damage to outer boom section...

Страница 8: ...ower to bottom position Open Inductor activation valve valve 8 to start venturi vacuum Add pre determined chemical amount to inductor tank and then open inductor tank valve valve 9 to allow chemical t...

Страница 9: ...as needed when changing chemicals NOTE Recommendation that a chemical neutralizer be run threw the rinse system between different chemical usages Follow procedures stated above Rinse with water follow...

Страница 10: ...be folded flat against the tongue when in transport or field operation see figure 18 FIG 18 FIG 19 OPTIONAL SPRAY CONTROLLER SPEED SENSOR 1 Start hyrdraulic pump and make sure you have at least 70 P...

Страница 11: ...A G S P R A Y C O M 1 0 FIG 10 FIG 20 1 Quick Fill For Main Tank 2 Quick Fill For Flush Tank 3 Quick Fill For Handwash Tank QUICK FILL FIG 11 2 3 1 1 2 1...

Страница 12: ...engine turn monitor off set park brake remove ignition key wait for nozzles to stop spraying before servicing adjusting repairing or unplugging 3 Follow good shop practices Keep service area clean and...

Страница 13: ...emove and clean thoroughly Also clean lubricant passageway Replace fitting if necessary Note Grease 19 points 8 hours or daily L R GREASE LOCATIONS 1 L R Breakaway Hinge 2 L R Outer Boom Hinge 3 L R I...

Страница 14: ...close Each motorized ball red wire connects to the 12V terminal Each motorized ball valve black wire will connect to ground terminal and each motorized ball valve white wire will connect to the corre...

Страница 15: ...e all valves several times Flush water through the booms 6 Repeat step 5 7 Calibrate the pump nozzles and sprayer before using 8 Go through the pre field checklist before using Ag Spray Equipment warr...

Страница 16: ...Z 8464 S KYRENE RD 85284 877 974 7166 P 480 705 8047 F 480 705 8048 TEMPE AGSPRAY COM OTHELLO WA 81 E PINE ST 99344 800 634 2026 P 509 488 6631 F 509 488 2927 OTHELLO AGSPRAY COM HOPKINSVILLE KY 1100...

Отзывы: