![AFRISO PrimoBox AZB Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/afriso/primobox-azb/primobox-azb_operation-and-installation-manual_2864806014.webp)
Instruction manual
14
PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets
ATTENTION
Possible need for other dowels
It is necessary to verify that the dowels provided are suitable
for the selected wall.
If the dowels provided are not suitable for the selected wall,
replace them with others.
Mounting the AZB unit on the improper dowels can lead to its
breaking off the wall!
6.2
Flush mounting
Check whether the wall is strong and thick enough and that
the PrimoBox AZB mixing kit will fit in the place you choose.
To install the PrimoBox AZB mixing kit in the wall, breach the fins
placed in the housing and bend them with pliers so that they
are outside the unit housing (Figure 10).
Then create a space in the wall, at least 2 cm larger than the external
dimensions of the housing of the AZB mixing kit. Fasten the module
in the
hole
in
the
wall
with plaster or other suitable
compound.
Remember
to
level it carefully using a spirit
level.
After
drying,
if necessary,
make an aesthetic finish
of the wall.
Fig. 10: Bending
of the housing fins
6.3
Hydraulic connections
Before connecting the AZB
mixing unit, flush the system
thoroughly, paying special at-
tention to removing residue from soldering, cutting pipes, etc.
Make sure that the installation contains safety components necessary
for proper and safe functioning. We recommend installing strainers
before inlet connections. The heating installation should also contain
filters, dirt separators or other similar filtering elements.