AFRISO PrimoBox AZB Скачать руководство пользователя страница 14

Instruction manual

 

 

 

14  

PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets 

 

ATTENTION

 

 

 

Possible need for other dowels

 

 

It is necessary to verify that the dowels provided are suitable 
for the selected wall. 

 

If the dowels provided are not suitable for the selected wall,  
replace them with others. 

 

Mounting the AZB unit on the improper dowels can lead to its 
breaking off the wall! 

6.2

 

Flush mounting 

Check  whether  the  wall  is  strong  and  thick  enough  and  that 
the PrimoBox AZB mixing kit will fit in the place you choose. 
To  install  the  PrimoBox  AZB  mixing  kit  in  the  wall,  breach  the  fins 
placed  in  the  housing  and  bend  them  with  pliers  so  that  they 
are outside the unit housing (Figure 10). 
Then create a space in the wall, at least 2 cm larger than the external 
dimensions of the housing of the AZB mixing kit. Fasten the module 
in the 

hole 

in 

the 

wall 

with plaster  or  other  suitable 
compound. 

Remember 

to 

level  it  carefully  using  a  spirit 
level.  
After 

drying, 

if necessary, 

make  an  aesthetic  finish 
of the wall. 
 

Fig. 10: Bending 

of the housing fins 

 

6.3

 

Hydraulic connections 

Before  connecting  the  AZB 
mixing  unit,  flush  the  system 
thoroughly,  paying  special  at-
tention  to  removing  residue  from  soldering,  cutting  pipes,  etc.  
Make sure that the installation contains safety components necessary 
for  proper  and  safe  functioning.  We  recommend  installing  strainers 
before inlet connections. The heating installation should also contain 
filters, dirt separators or other similar filtering elements.

 

 
 
 

 

Содержание PrimoBox AZB

Страница 1: ... the Operation and installation manual 954 001 0001 AFRISO sp z o o Szałsza ul Kościelna 7 42 677 Czekanów POLAND Telefon 48 32 330 33 55 Fax 48 32 330 33 51 zok afriso pl www afriso pl Operation and installation manual PrimoBox AZB mixing units with low loss header 200 and 300 series in cabinets ...

Страница 2: ...1 Construction 6 3 2 Dimensions 7 3 3 Operation 7 3 4 Hydraulic diagram sample 9 3 5 Sample application diagrams 9 4 Specification 10 4 1 Approvals 10 4 2 Flow and available pressure diagrams 11 5 Transport and storage 12 6 Installation and commissioning 13 6 1 Wall mounting 13 6 2 Flush mounting 14 6 3 Hydraulic connections 14 6 4 Electrical connections 16 7 Assembly and disassembly of ARM ProCli...

Страница 3: ...ich if not avoided will result in death or serious injury WARNING WARNING indicates a potentially hazardous situa tion which if not avoided can result in serious in jury or equipment damage NOTICE NOTICE indicates a hazardous situation which if not avoided can result in equipment damage 2 Information on safety 2 1 Intended use Mixing units PrimoBox AZB 200 and 300 series are a compact prefabricate...

Страница 4: ...mmissioned shut down and disassembled by suitably qualified and trained personnel Work on electrical circuits should only be carried out by an authorized electrician 2 4 Modifications to the product Changes and modifications carried out by unauthorized persons may cause hazards and are prohibited for safety reasons 2 5 Using additional parts and accessories Improper additional parts and accessorie...

Страница 5: ...of the medium and the correct operation of the pumps in all heating circuits They also allow obtaining different flow temperatures of individual heating circuits The PrimoBox AZB mixing unit is enclosed in a metal cabinet Inside the cabinet there is a manifold with a built in low loss header ensuring independent operation of individual heating circuits while minimizing the impact of circulation pu...

Страница 6: ... mm pump 3 zone 1 return pipe 4 zone 2 return pipe 5 rotary valve with ARM ProClick actuator 6 primary circuit return shut off valve 7 primary circuit supply shut off valve 8 automatic air vent 9 cabinet 10 electrical box 11 manifold 12 zone 1 supply pipe 13 electric wires 14 zone 2 supply pipe Fig 1 Construction of AZB 205 mixing unit 1 1 1 2 2 1 3 4 5 6 7 10 9 11 12 10 14 13 3 ...

Страница 7: ...to divide the heating medium flow from the boiler circuit into two or three heating circuits The manifold used with a built in low loss header eliminates the need to balance the primary circuit of the boiler with other circuits This ensures smoothness and high efficiency of the installation operation regardless of the current hydraulic conditions and the current demand for heating power Using the ...

Страница 8: ...lve knobs contain thermometers to control the temperature of the heating medium By turning the knob by 45 the non return valve is forced to open to enable system maintenance and system filling Grundfos UPM3 AUTO 15 70 circulation pumps For the operation of the Grundfos UPM3 AUTO circulation pumps included in the PrimoBox units please refer to the attached operating instructions also available on t...

Страница 9: ... Hydraulic diagram sample Fig 4 PrimoBox AZB 351 hydraulic diagram 3 5 Sample application diagrams Fig 5 Sample application diagram 2 circuits of underfloor heating system and a radiator system circuit 4 2 3 1 3 1 AZB mixing unit 2 Installation controller 3 Underfloor heating circuit 4 Radiator circuit ...

Страница 10: ...ce connections G Connection of individual zones famale G Heating medium temperature 5 C 95 C Glycol concentration max 30 Installation power max 35 kW Supply voltage Supply voltage 230 V AC 10 50 Hz Power consumption max 52 W Housing protection IPX 0 4 1 Approvals Mixing units with manifold AZB series 200 and 300 are subject to the Pressure Directive 2014 68 EU and in accordance with art 4 3 sound ...

Страница 11: ...low loss header 200 and 300 series in cabinets 11 4 2 Flow and available pressure diagrams Fig 6 Graph of flow rate and disposal pressure through a direct circuit Fig 7 Graph of flow rate and disposal pressure through a circuit with rotary mixing valve ...

Страница 12: ...t with ATM thermostatic mixing valve 5 Transport and storage ATTENTION Possibility of damage to the device during improper transport Do not throw the device Protect against water moisture dirt and dust ATTENTION Possibility of damage during incorrect storage Store the device in a dry and clean room Protect against water moisture dirt and dust ...

Страница 13: ...ted on stands or placed directly on the floor ATTENTION Possible damage to existing installations When drilling into walls pay special attention not to damage electric cables or other existing cables 6 1 Wall mounting On the selected straight wall mark the places provided for the han dles so that they coincide with the holes in the back of the PrimoBox AZB mixing unit Drill holes in the wall and p...

Страница 14: ...pliers so that they are outside the unit housing Figure 10 Then create a space in the wall at least 2 cm larger than the external dimensions of the housing of the AZB mixing kit Fasten the module in the hole in the wall with plaster or other suitable compound Remember to level it carefully using a spirit level After drying if necessary make an aesthetic finish of the wall Fig 10 Bending of the hou...

Страница 15: ... top of the unit The connection should be made by G male threads 6 3 1 2 Connection with the AFRISO PrimBox AHB separation unit AZB mixing units can be com bined with the AHB 620 and AHB 622 separation units to form a heating column with the function of separating two heat sources and all func tions of the AZB sets This connection is carried out by the AJB 110 junction kit Art No 76 110 00 The fig...

Страница 16: ... has been disconnected and protected against accidental switching on Safety regulations and other relevant accident prevention regulations must be observed You should also comply with all applicable national laws The PrimoBox AZB mixing unit is connected to 230V AC PrimoBox mixing units have a built in electrical box All necessary cables have already been distributed from the electrical box WARNIN...

Страница 17: ...ick actuators must be electrically connected to a suitable 3 point controller with a 230 V AC control signal In the version of the AZB 365 mixing unit with three actuators one of the actuatirs is connected via a loose triple connection block placed inside the electric box see Fig 14 Fig 14 Electrical diagram of connecting the third ARM ProClick actu ator in the AZB 365 mixing kit through a loose c...

Страница 18: ...valve is exactly halfway between the hot water inlet and the cold water inlet Then slide the actuator onto the mixing valve until the ProClick mechanism locks on it When mounting the ProClick actuator on a rotary valve pay attention to the current position of the valve cover The valve stem should be positioned as in Figure 19 and the actuator position indicator should show half the scale If the va...

Страница 19: ...bles manual operation i e free operation of the actuator with an allen key Fig 14 Actuator mode buton 9 Temperature setpoint with ATM thermostatic valve The temperature of the heating medium at the MIX outlet of the ATM valve is set by a knob according to the following table setpoint temperature 1 20 C 2 25 C 3 29 C 4 33 C 5 37 C 6 43 C Fig 20 ATM 561 thermostatic valve knob The selected setting o...

Страница 20: ...date of purchase from AFRISO sp z o o In case of any alteration in the prod uct or usage against this instruction manual the warranty becomes void 12 Copyright Copyrights to the manual belong to AFRISO sp z o o Reprinting translation and reproduction even partial is prohibited without written permission Changing technical details both in writing and in the form of images is prohibited by law We re...

Отзывы: