– German –
Maintenance
ÖWWG 3
27
8.2
Maintenance activities
Replacing the mains fuse F1
Mains voltage is interrupted and cannot be switched on.
1. Open the control unit, see chapter 6.2, page 17.
2. Remove the transparent cover from the mains fuse F1.
3. Replace the mains fuse F1, see table 1, page 14.
4. Snap the transparent cover onto the mains fuse F1.
5. Connect the flat cable to the connector.
6. Close the control unit, see chapter 6.2, page 17.
7. Switch on the mains voltage.
Replacing the probe fuse F2
Mains voltage is interrupted and cannot be switched on.
1. Open the control unit, see chapter 6.2, page 17.
2. Pull the probe fuse F2 from the base.
3. Plug a new probe fuse F2 into the base, see table 1, page 14.
4. Connect the flat cable to the connector.
5. Close the control unit.
6. Switch on the mains voltage.
Содержание OWWG 3
Страница 32: ... Deutsch Anhang ÖWWG 3 31 16 Anhang 16 1 EU Konformitätserklärung ...
Страница 33: ...Anhang Deutsch 32 ÖWWG 3 16 2 Zulassungsunterlagen ...
Страница 34: ... Deutsch Anhang ÖWWG 3 33 ...
Страница 35: ...Anhang Deutsch 34 ÖWWG 3 ...
Страница 36: ... Deutsch Anhang ÖWWG 3 35 ...
Страница 37: ...Anhang Deutsch 36 ÖWWG 3 ...
Страница 38: ... Deutsch Anhang ÖWWG 3 37 ...
Страница 39: ...Anhang Deutsch 38 ÖWWG 3 ...
Страница 70: ... German Appendix ÖWWG 3 31 16 Appendix 16 1 EU Declaration of Conformity ...
Страница 101: ... Français Annexe ÖWWG 3 31 16 Annexe 16 1 Déclaration de conformité UE ...
Страница 135: ...Aneks niemiecki 34 ÖWWG 3 16 Aneks 16 1 Deklaracja zgodności UE ...