
Mounting and commissioning
KAV
11
5.2
Adjusting the safe height
1
KAV installation
site
2
Maximum level
in the tank
3
Safe height,
4.0 m maxi-
mum
4
Fuel oil filter
5
Fuel oil de-
aerator
6
Fuel oil con-
sumer
Fig. 5: Safe height = height difference between maximum level in the
tank and lowest point of the oil-carrying pipe
1.
Determine the safe height as per fig. 5.
2.
Use the wheel to adjust the determined value at the scale.
3.
Fit the seal to secure the adjusted value.
4.
After installation, the suction line between the fuel oil storage
tank and the burner pump must be de-aerated.
5.3
Commissioning KAV
Prior to commissioning the system, check KAV as described below:
1.
Verify proper installation.
2.
Verify tightness of KAV and the connections.
3.
Verify that the safe height matches the value adjusted at the
KAV.
4.
Verify the integrity of the lead seal.
5.
De-aerate KAV, see chapter 6.2, page 13.
6.
Have the specialised company certify proper installation and ad-
justment of KAV, see chapter 13.1, page 20.
Содержание KAV
Страница 17: ...Wartung 16 KAV 4 Absperrventil schließen 5 Die Verschraubung der Filtertasse öffnen ...
Страница 22: ...Anhang KAV 21 13 2 Zulassungsunterlagen ...
Страница 23: ...Anhang 22 KAV ...
Страница 24: ...Anhang KAV 23 ...
Страница 25: ...Anhang 24 KAV ...
Страница 41: ...Maintenance 16 KAV 4 Close the shut off valve 5 Open the screw connection of the filter cup ...
Страница 46: ...Appendix KAV 21 13 2 Approval documents ...
Страница 47: ...Appendix 22 KAV ...
Страница 48: ...Appendix KAV 23 ...
Страница 49: ...Appendix 24 KAV ...
Страница 68: ...Maintenance KAV 19 4 Fermez la vanne d arrêt 5 Ouvrez le raccord à vis du bol de filtre ...
Страница 73: ...Annexe 24 KAV 13 2 Agréments ...
Страница 74: ...Annexe KAV 25 ...
Страница 75: ...Annexe 26 KAV ...
Страница 76: ...Annexe KAV 27 ...