52 Maintenance
4510012 - REV F – 220621
Maintenance Schedule
Adherence to the maintenance schedule below will extend the life of the GEN-S, ensure the
best performance, and reduce the likelihood of injury.
Frequency
Maintenance Task
Every hour during operation
Visually check the water level in the Sight Glass.
Check for leaks from the Sight Glass. If leaks are found, tighten
the Sight Glass fixture nuts or replace the Sight Glass gaskets
Every 4 hours during first week
Perform blowdown procedure (see “Blowdown Procedure” on
).
Daily at end of workday
Perform blowdown procedure (see “Blowdown Procedure” on
).
Every 2 weeks
Clean or replace the Strainer (see “Cleaning or Replacing the
).
Every 3 months
Perform manual cleanout (see “Manual Cleanout” on page
).
Check and clean the Probes (see “Checking and Cleaning the
).
Содержание STC-WSN300-2M
Страница 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Страница 2: ...2 Abbreviations 4510012 REV F 220621 ...
Страница 8: ...8 Abbreviations 4510012 REV F 220621 ...
Страница 28: ...28 Introduction 4510012 REV F 220621 STC WSN600 2M GEN S Top View Front View Exit View Entry View ...
Страница 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Страница 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Страница 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Страница 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Страница 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Страница 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Страница 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...
Страница 84: ...84 Technical Support 4510012 REV F 220621 ...