Installation and Setup 11
4510003 Rev B
Installation and Setup
AC Power
In many locations where the heat tunnel is installed, AC power may be subject to line
noise, brownouts, and blackouts. If any of these occur on a regular basis, a good-
quality line conditioner or Uninterruptible Power Supply (UPS) should be installed to
ensure data integrity. In many cases, these devices may not be necessary. If system
lockups occur, the first corrective measure should be to isolate and clean up the AC
power.
Work Area
The ES-200A may require occasional cleaning due to environmental contaminants.
Maintenance Access
When planning the installation, allow for easy access to the tunnel for convenient
cleanup, maintenance, and repair.
IMPORTANT:
Turn off power and allow the heat tunnel to cool before cleanup,
maintenance, and repair.
Unpacking and Placement
1. Open the box.
2. Roll the tunnel assembly out of the box on its casters.
3. Examine the tunnel exterior for damage.
Содержание ES-200A
Страница 1: ...4510003 Rev B ES 200A Convection Heat Shrink Tunnel User Guide ...
Страница 2: ...4510003 Rev B ...
Страница 4: ...4510003 Rev B ...
Страница 25: ...Schematic Diagrams 25 4510003 Rev B Fan Inverter Setting 2 1 M FAN FAN FAN M M 1 2 3 ...
Страница 26: ...26 Schematic Diagrams 4510003 Rev B ES 200A Wiring Diagram ...
Страница 27: ...Schematic Diagrams 27 4510003 Rev B ...
Страница 28: ...28 Schematic Diagrams 4510003 Rev B ...
Страница 40: ...4510003 Rev B ...
Страница 41: ...4510003 Rev B ...
Страница 42: ...4510003 Rev B ...