6
© AFL Hyperscale. All rights reserved
24f cable looped inside the raceway.
Use tie-off positions for network duct/cable.
Secure using hose clip.
5
3
Install 24f cable – minimum overlength 3m from
gas block (Ø3mm blowing cable only).
Cut the ducts to length and push duct into teeth
and secure with cable tie. Push on blowing
indicator (not supplied).
4
2
Installation Process