40
– 66
Operating instructions EN
◼
SE-24
◼
01.06.2022
◼
V1.5
7.1.11 Parameterization connection [X4]
The parameterization connection on the SE-24 servo controller is carried out as a 4
pole M8 socket.
7.1.11.1 Parameterization
connection [X4]
Figure 12: View of the connection [X4]
7.1.11.2 Mating plug [X4]
The following components are required for parameterization:
▪
Programming cable SE-24, 5m, Afag No. 50315431
▪
SE-24 Stick, Afag No. 50315432
▪
SE-24
parameterization software, “afag Tools” (free download at:
For a description of the “afag Tools” parameterization software please refer to the
document
SE-24 Software Manual
X4, parameterization connection
Female socket, 4 pole M8
Binder: 09-0412-00-04
Subminiature connector, series 712
Pin
Designation
Specification
1
CAN_H
CAN high
2
CAN_L
CAN low
3
24V DC
Supply of brake
release switch
4
brake_release
Input of brake
release switch
Содержание 50315434
Страница 1: ...Servo Controller SE 24 Operating Instructions Operating manual Copyright by Afag Automation AG ...
Страница 47: ...Operating instructions EN SE 24 01 06 2022 V1 5 47 66 Figure 17 Example of a circuit diagram of the SE 24 I O ...
Страница 65: ...Operating instructions EN SE 24 01 06 2022 V1 5 65 66 ...