Aeronaut BLADE 2 Скачать руководство пользователя страница 5

 

                                                                                                                    Blade 2 

 
Building instructions - Blade 2 

Page 5 

Battery su Centre of Gravity 

 

To set the correct Centre of Gravity install all the internal components including motors, cables, con-
nectors and RC system, fit the formers (8 + 9) and the two flight batteries (but don’t glue them!), and 
adjust the position of the flight packs until the model balances at the stated point. The correct CG is 36 
cm forward of the rearmost edge of the fuselage. Place the model on a length of tube located at this 
point, and check that the CG really is correct.  

                

 

 
Solder the four sockets (18) to the cables attached to the two speed controllers, and glue the sockets 
(18)  in  the  former  (8).  The  four  plugs  can  now  be  soldered  directly  to  the  NC  batteries,  using  the 
sockets installed in former (8) as a template. Cut a slot in the fuselage (1) under the canopy to accept 
the  former  (8),  to  keep  it  accurately  in  position  when  it  is  glued  in  place.  Please  take  great  care  to 
connect  the  batteries  with  correct  polarity.  Sand  off  the  burned  edges  from  the  joint  areas  of  the 
formers before gluing them in the fuselage. 
 
 

 
 

 

 
 
 

Содержание BLADE 2

Страница 1: ...No 1356 00 Specification Wingspan 1404 mm Length 1022 mm Wing area 35 6 dm Wing loading 73 106 g All up weight 2600 3800 g RC functions Aileron elevator and rudder Motor aero naut Modellbau GmbH Co K...

Страница 2: ...involving the GRP components do not trust 5 minute epoxy Experienced builders may wish to deviate from the sequence of construction described in these building instructions this is left up to the disc...

Страница 3: ...front of the canopy 2 as follows slip the tube 4 on the steel pin 3 apply a little epoxy to the tube and press the canopy 2 down onto it Leave the epoxy to set hard then remove the canopy and apply mo...

Страница 4: ...system instructions and fit suppressors in the leads Cut the slots for the horns 12 in the elevons and glue the horns 12 in the slots Connect the horns 12 to the servos using the threaded pushrods 11...

Страница 5: ...Place the model on a length of tube located at this point and check that the CG really is correct Solder the four sockets 18 to the cables attached to the two speed controllers and glue the sockets 18...

Страница 6: ...instructions Blade 2 Installing the receiving system The Blade 2 requires only two control functions elevons superimposed ailerons elevators and speed controller The elevon travels must be correct if...

Страница 7: ...hallow at first so that adequate speed can build up as it is a characteristic of ducted fans that they are only capable of working efficiently when the model is flying fast If trim corrections are req...

Отзывы: