12
V.
MAINTENANCE SCHEDULE
The Programmable Bi-directional Booster Amplifier is designed for unattended
operation requiring minimal maintenance. General maintenance consists of equipment
inspection an operational tests. Periodical equipment tune-up and alignment is
recommended.
Cable Inspection:
The external and internal cables and connectors should be checked for
indication of corrosion.
Enclosure Inspection:
The interior of the enclosures should be inspected for evidence of
condensation.
LED Inspection:
Power LED: ON
Status LED: Flashing at a rate of 1Hz
Com LED:
OFF
The performance of operations testing is recommended to be done bi-yearly.
Operational testing will indicate equipment status determining if an alignment is
necessary.
Содержание 50289-RBA-800MHz
Страница 2: ...2 PROGRAMMABLE BI DIRECTIONAL BOOSTER AMPLIFIER PBBA MODEL 50289 RBA 800MHz P N 50483 02 25...
Страница 7: ...7 PROGRAMMABLE BI DIRECTIONAL BOOSTER AMPLIFIER PBBA MODEL 50289 RBA 800MHz P N 50483 02 25 FIGURE 1...
Страница 16: ...16 PROGRAMMABLE BI DIRECTIONAL BOOSTER AMP...
Страница 17: ...17 ATTENUATOR AMPLIFIER MODULE...
Страница 18: ...18 MMIC AMPLIFIER 1...
Страница 19: ...19 MMIC AMPLIFIER 2...