16
E
nglish
AGLLIJ 0907 - 4528550_03
ATTENTION: before carrying out any
intervention, make sure that the elec-
tric power supply has been discon-
nected.
CAUTION: before carrying out any
work, wear the appropriate individual
protection devices.
ATTENTION: The appliance must be
installed in compliance with national
regulations on this subject.
ATTENTION: the electric connections,
the installation of the fan coils and
their accessories must only be perfor-
med by subjects with the technical-
professional requisites for enabling
and installation, transformation, exten-
sion and maintenance of the systems
and able to check the same for safe-
ty and functionality purposes (in this
manual they will be indicated by the
generic term "staff with specific tech-
nical skill").
In particular, for the electric connec-
tions, checks relative to the following
are requested:
- Measurement of the electric plant iso-
lation resistance.
- Continuity test of the protection wires.
ATTENTION: Install a device, master
switch or electric plug that allows to
completely interrupt the appliance’s
electric power supply.
Here find the essential indications for
correct installation of the appliance.
The completion of all operations, accor-
ding to specific requirements, is left to
the experience of the installer.
Also consult the FCL installation manual
and the user manual supplied with the
grid unit.
Generally the best position of the louve-
red fins is that that allows the launch of
the air adhering to the ceiling for the
coined effect, during cold functioning.
The side section of the deflectors
(GLL10) shows the opening positions
for proper warm functioning (opening
20°) and cold functioning (opening
10°) of the machine.
For the units with GLL20 grids, it is
recommended to completely open the
deflector in heating mode. In cooling
mode, rotate the deflector to half way.
Depending on the user's requirements, it
is possible to position the louvered fins
in the intermediate of complete closure
positions. Thanks to the special shapes
of the louvered fins the machine can
also function with the deflectors com-
pletely closed.
Do not install at height of above three
metres.
The FCL unit is set for connection with
fresh air ducts and for the flow of the
treated air in an adjacent room.
INSTALLATION
In caso di installazione in prossimità
di una parete è possibile chiudere la
corrispondente bocchetta di mandata
con la guarnizione fornita a corredo.
If installed in proximity of a wall it is
possible to close the corresponding
flow inlet using the gasket supplied.
• InstallatIon In proXImItY oF a Wall
Содержание GLL10
Страница 47: ......