5.Operation 

 
5.1 electrical connection 

 

Before connecting the air dryer, the following items must be checked: 

  Does the mains voltage coincide with the voltage of the appliance? 
  Adequate fusing of socket and supply system? 
  Has the required residual-current-operated circuitbreaker (r.c.c.b) been installed 

in case of swimming baths? 

  If a cable drum is used: has it been unwound completely? 
  Is the appliance connector suitable for the building socket? 
  Is the socket provided with a perfect grounding? 

 

ATTENTION: 

Before putting the air dryer into operation, the technical data of the appliance should 
be compared to the conditions prevailing in the room of installation

 
 

5.2 Putting into operation 

 

ATTENTION: 

Before putting the air dryer into operation, the instruction manual should be studied 
carefully. Thus, damages by a false or inappropriate operation as well as by 
inadequate environmental conditions can be avoided

.  

 

For using the air dryer, please proceed as follows: 

  After having been transported, the air dryer should rest for abt. 15 min. During 

this period of time, the oil distributed inside the refrigerating system and frothed 
during transport will return into the compressor. We recommend this procedure 
since it extends the service life of the compressor. 

  Make sure that a socket and a runoff is near the installation place. When using a 

device without pump (standard), the runoff must be placed below the unit. 

  Attach mounting bar to the planned wall (see rough draft point 4). Arrange with 

spirit level! 

  Put up device on the mounting bar. Above the device is right and left in each 

case a screw. With these screws, the device is to be fixed on the mounting bar. 

  Connect the available hose to a runoff. Guarantee that the hose is attached 

certainly to the drain and can not slip. If the hose length should not be sufficient, 
extend the hose with a nipple and two clamps. (accessory). Test for tightness! 

  The hose must be moved away with slope of the device. The hose must not be 

buckled. 

  Put the plug into the socket. 
  Switch on the unit at the hygrostat. You find the hygrostat in the front. 
  Adjust the required humidity value at the hygrostat. (see hygrostat-control). 
  Is the actual humidity higher than the required value, the dehumidifier will start.  
  Is the actual humidity lower than the required value the dehumidifier will not start.  

 
 
 
 
 
 

Содержание AD 110

Страница 1: ...page 1 of 13 Instruction manual _____________________________________ Dehumidifier AD 110 _____________________________________ valid 02 2012...

Страница 2: ...ical connection 6 5 2 Putting into operation 6 5 3 Operation panel 7 5 4 Hygrostat control 7 8 5 5 Condensate outlet 8 5 6 Automatic defrosting 8 6 Operating conditions 8 9 7 Technical data 9 10 8 Ser...

Страница 3: ...order to be able to send the device safe for guarantee repair In order to save place you open simply the adhesive tape with a knife and you fold the carton 2 Mode of operation The AD air dryer is cons...

Страница 4: ...Using as directed The condensation dryers are intended for the drying of air with atmospheric pressure Risk by accessory Hoses for condensate removal and air filters must be fit expertly and must not...

Страница 5: ...and the air filter must at least conduct 1 meter The open space under that dehumidifier must conduct at least 10 cm That dehumidifier is attached with the delivered mounting bar to a wall Rough draft...

Страница 6: ...of time the oil distributed inside the refrigerating system and frothed during transport will return into the compressor We recommend this procedure since it extends the service life of the compressor...

Страница 7: ...midity is higher than 80 60 The dehumidifier switches off when a humidity of approx 60 r h has achieved And switches on again when humidity is higher than 60 40 The dehumidifier switches off when a hu...

Страница 8: ...ding on the extent of ice formation the appliance will be defrosted automatically according to the following principle A temperature sensor measures the condition existing in a critical area of the ev...

Страница 9: ...hat extremely air movings around the dryer can annoy or affect the function of the dryer as the air flow of the dryer can not flow as planned In the case of doubtful operating conditions it is recomme...

Страница 10: ...ure is recommended Switch OFF the air dryer Disconnect mains cable Remove filter for cleaning or disposal During strong pollution Dismantle cover and top Blow out device cautiously with compressed air...

Страница 11: ...h voltage Check the main cable an additional cable the socket and the main fuse The at the hygrostat adjusted value has been achieved The dryer will start again after exceeding the adjusted humidity 4...

Страница 12: ...ng defects and malfunctions of AERIAL air dryers we recommend to get in touch with your supplier 10 Disposal Please do not dispose this unit with the domestic waste and please do not dispose this unit...

Страница 13: ...ready for connection Related standards EN ISO 12100 Safety of Machinery EN 61000 Electromagnetic Compatibility EMC Basic Specification Emitted Interference EN 60335 2 40 Safety of electric appliances...