1B+ II Water Wizard Water Heaters
HE-110
Installation, Operation & Maintenance Manual
OMM-0063_0D
11/28/2018
Page 43 of 50
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, New York 10913
•
Phone: 800-526-0288
12.6 Reassembly of Shell
Reassemble the Heater Shell
assembly as follows:
12.7 Reinstalling Heater in Facility
Reassemble all components that were disconnected in paragraph 5.2. When re-installing the Thermal
Element into the Thermal Well Bushing in the Top Head, be careful not to damage the Element against
the internal Coils. Straighten the Element before inserting.
12.8 Startup Procedure
Follow the operating procedure in Chapter 4: Start-Up Operation in document AC–103, OMM-0001
Pneumatic Temperature Controller
. If you are using electronic controls, refer to document AC–105,
OMM-0003
Electronic Control System (ECS) and Type CXT-E Electronic Valve.
Reassembly of Shell Instructions
1)
Install fittings into the inlet and outlet of the Bottom for the Risers that can supply a hydrostatic
pressure source.
2)
One fitting should have a valve for the release of internal air pressure.
3)
The other fitting should be attached to a source to apply the maximum allowable working
pressure, (MAWP) to the internal Coil and Riser Bundle.
4)
Apply MAWP to the Coil Bundle.
5)
Close off both inlet and outlet valves to retain the internal pressure for 20 minutes.
6)
If leaks are detected, remove the internal pressure.
7)
Remove the leaking Coil and inspect for causes for leak.
8)
If the leak is due to debris, clean the Coil and reinstall.
9)
If there are damages to any surfaces, contact your AERCO Representative for instruction for
returning the failed Coil.