![AEG UPS IST3 1-10kVA Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/aeg/ups-ist3-1-10kva/ups-ist3-1-10kva_user-manual_13524007.webp)
(1-10kVA) UPS IST3
User Manual
8
Only authorized professionals are allowed to open the UPS chassis to avoid electric shock.
Otherwise, if it causes UPS failure, it is out of the guarantee range.
UPS is a class A product. When it is applied to residential building, additional measures should
be taken to prevent harassment.
Ensure that no liquid or other foreign objects can enter into UPS.
UPS must be grounded well.
If UPS has to be moved, rewired or maintained, it must disconnect all electrical
connection, such as AC power, battery power, etc. to isolate power. It can't perform any
work on the UPS until UPS is powered off completely(≥10min). Otherwise, the output
may have electricity, which may cause electric shock.
When dismantling fan, do not put fingers or tools into the rotating fan until it has stopped
working to avoid device damage or human injury.
Don’t connect unbalance load, half-wave rectification load or inductive load in the output
of UPS, such as air-condition, blower, starter, electric drill, motor, daylight lamp, etc.
In case of fire, use dry powder extinguisher to put out the fire. If you use liquid fire
extinguisher, it may cause electric shock.
Battery Announcements
Please use specified model battery
!
Non-specified model battery will lead to UPS damage.
Only authorized professional can replace battery. When operation, take off conductive
objects, such as watch, bracelet, bangle, ring, etc., wear rubber shoes and gloves and
use tools with insulated handle.
Содержание UPS IST3 1-10kVA
Страница 1: ...i UPS IST3 1 10 kVA User Manual ...
Страница 2: ...iii ...
Страница 15: ... 1 10kVA UPS IST3 User Manual 16 2 2 2 Rear Panel View 1kVA UPS Rear panel of 1kVA UPS ...
Страница 33: ... 1 10kVA UPS IST3 User Manual 34 Install optional intelligent slot and fix it Connect communication cable ...