To be carried
out
ly trained
staff
or
AEG specialists.
Take
the
drCldt-breaker
out
of serv~ce.
an nr
1
':,ning of the pole
c~::.!m:1s
i$
not necessary.
fixed
inside
the
operating
mechanism
cubic'le
Check of the
securing
elements
of the
linkage
-
Functional
check
of the
electrical
control
circuits
-
Measurement
of tile operating
times
chapter
3.5
chapter
3.6
-
Measurement
of t~le res i stance
of the
main circllit
2.3
Reconditioning
To be carried
out
by trained
staff
or
AEG specialists.
Take the
circuit-o-reaker
out
of service,
an opening
of the
pole
columns
is-
necessary.
Содержание SF6
Страница 1: ...Opl rating instructions lo 127 B Type 51 145 Fl 4 131 5R with spring operating mechanism eRR 5 ...
Страница 21: ...Fig 83 Exploded view of tle spring operating mechanism ...
Страница 31: ...SF 1377 0 SF 1377 d SF 1377 0 SF 1377 0 SF 1377 _ 0 SF 1377 d SF 1377 0 SF 1377 0 ...
Страница 32: ...SF 1377 c rUlUb m m I SF 1377 c J i SF 1377 SF 137 b 0 SF 1377 SF 1377 0 b ...
Страница 33: ...BeruLub FK 33 Fig B8 Points of lubrication at the interrupter unit and at thE arcing contacts ...
Страница 34: ...SF 1377 bl SF 1377 bl SF 1377 II 1 _ _ _ __ L i SF 1377 bl SF 1377 cl SF 1377 bl SF 1377 bl ...
Страница 35: ...1 CLtl _ l1oLykote BR2 pLus l 0 ...
Страница 38: ...2 7 17 2 7 18 2 7 16 2 7 02 2 7 18 2 7 03 2 7 01 2 7 06 2 7 11 2 7 07 2 7 22 ...