
818 21 80-00/3
21
Prior to Initial Start-Up
1
Before connecting the appliance to the mains and putting it into ope-
ration for the first time, leave the appliance to stand for 30 minutes if
transported upright. After transport on its side, the appliance must be
left to stand for 4 hours before putting it into operation. This is neces-
sary to allow the oil to flow back into the compressor. Otherwise the
compressor may be damaged.
0
1.
Please clean the appliance interior and all accessories prior to initial
start-up (see section: "Maintenance and Cleaning").
2.
Remove the cold accumulation block from the freezer tray.
3.
Place the cold accumulation block into a compartment or drawer only
after the optimal storage temperature of -18 °C has been reached, and
allow to freeze.
4.
After 24 hours place the cold accumulation block at the freezer tray or
at the front of the upper drawer.
5.
Re-freeze the thawed cold accumulation block in the same fashion, e.g.
after cleaning the appliance.