AEG BS 35 Скачать руководство пользователя страница 10

10

3. Guarantee

4. Trouble-shooting

For guarantees please refer to the respec-
tive  terms  and    conditions  of  supply  for 
your country.

 

  The installation, electrical

 

  connection and first operation of 

this appliance should be carried out by a 
qualified installer.

The company does not accept liability  
for failure of any good supplied which 
have not been installed and operated 
in accordance with the manufacturer’s 
instructions.

Fault

Cause

Solution

No hot water despite

flow volume setting at

right-hand stop.

The water flow volume required 

for the unit to turn on has

not been reached.

- The shower head is   

   blocked with dirt or 

   limescale.

- Flow volume too low

- Clean shower head

- Increase flow volume.

The unit is not working. 

Electricity supply and

flow available.

The water flow volume 

required for the unit to turn 

on has not been reached.

- Filter in the cold water  

  connection pipe blocked 

  with dirt.

- Water pressure not    

  enough

- Clean the filter after shut-

  ting off the cold  water 

  intake

- Increase mains pressure

“ELSD” Light on

- The safety device 

  activated.

- Press “Reset” button

Содержание BS 35

Страница 1: ...SHOWER WATER HEATER MODEL BS 35 45 60 BS 35 E 45 E 60 E OPERATION AND INSTALLATION INSTRUCTIONS ...

Страница 2: ...ng children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure that they do not play with the appliance Thiswaterheatermustbeinstalled waterandelectricalinstallation commissioned and serviced by...

Страница 3: ...mm 360 mm 280 mm 9 8 7 Functions Mounting dimensions Fig 3 Fig 4 min 4 5 mm max 10 mm 10 11 The cable bushing must be used to provide protection against the penertration of water The unit must be earthed Fixing method Electrical connection 3 1 Installation instructionsfor the qualitified installer ...

Страница 4: ...ating Element b Electronic control set PhaseCut c ELSD Circuit d Triac Set e AutoThermostat f ELSD Button Board g ELSD Sensor Coil b c a d e f g Fixing cleaning Wiring Diagram 1 Installation instructionsfor the qualitified installer ...

Страница 5: ...rtant information The unit must not be put under pressure The outlet of the unit is also used as a vent A periodical scale removal is essential for the function of the shower head The unit is optional equipped with an ELSD Type BS E only It is recommended to test the ELSD one time per month How to test Switch on the electrical supply Press the Test button the Trip light will go on Press the Reset ...

Страница 6: ... Rate pressure 0 MPa 0 bar Water connection G Extenal Thread Electrical connection 1 N PE AC 220 240 V Recomended circuit breaker 20 A 25 A 32 A Recomended cable size Sqmm 2 5 4 4 6 Rated power kW Rated current A kW A kW A kW A 220 V 3 5 15 9 4 5 20 5 6 0 27 3 230 V 3 8 16 5 4 9 21 3 6 6 28 7 240 V 4 2 17 5 5 4 22 5 7 1 29 6 ...

Страница 7: ...5 Hot water connection for shower hose 6 Cold water connection Fig 2 7 Lower fixing hole 8 Position for electrical connection concealed 9 Upper fixing hole Fig 3 10 Depth for mounting screw 11 Rear wall installation Fig 5 12 Combination filter seal 13 Washer 14 Water valve 15 Union nut provided by client Fig 7 16 ELSD option 2 Operating instructions for the qualitified installer ...

Страница 8: ...s and higher than shower head level 2 5 Installing the unit 1 Flush the cold water pipe thoroughly 2 Fit a secure connection cable ensure size is correct 3 Release cover securing screw 4 Remove cover 5 Determine the position of the drillholes and drill the holes Insert the wall plugs and screw in the screws ensure screw insertion depth is correct 10 Fix the base to the wall 6 Feed the connection c...

Страница 9: ... use Advise the user about possible hazards high water temperature Hand over these instructions to be kept in a safe place 2 7 Service note When carrying out any work isolate the unit from the mains and shut off the water connection 2 Operating instructions for the user and the qualitified installer ...

Страница 10: ...Cause Solution No hot water despite flow volume setting at right hand stop Thewaterflowvolumerequired for the unit to turn on has not been reached The shower head is blocked with dirt or limescale Flow volume too low Clean shower head Increase flow volume The unit is not working Electricity supply and flow available The water flow volume required for the unit to turn on has not been reached Filter...

Страница 11: ...11 ...

Страница 12: ...SIZE A5 MATERIAL GREEN READ PAPER 75 G PLASTIC BAG 7 x 11 INCH PART NO 7901 269459 PART NAME MANUAL BS Rev 04 Product code BS 35 E 221070 BS 45 E 221071 BS 60 E 221072 ...

Отзывы: