7000-SERIES MULTI-AMP CONFIGURATION GUIDE
97-8002465_06-09-14
Information subject to change
11
Figure 3.8 – Verifying DC Offset
Figure 3.9 – Verifying Amp Gain
3.8.3
Connect Load and Test System Output
Power down the amplifiers.
1.
Connect the two output wires leading from the MASTER and SLAVE OUTPUT connectors to your load.
2.
Power up both amplifiers and allow them to come to the Ready state.
3.
Apply a sine wave of 5 Vrms at 100 Hz at the Master amplifier input. Using a voltmeter, measure across
4.
the system load to verify an output from the system of approximately 200 Vrms. See
Figure 3.10.
Check the completed system diagram in
Figure 3.11
to verify proper system setup.
5.
Turn input signal up to the level required for your application.
6.
‘