Advantech SKY-524 2U Скачать руководство пользователя страница 3

SKY-524 Startup Manual 

/SKY-524快速入门手册/SKY-524快速入門手冊

  3

Inner view

Front LED Indicator/

前部LED指示灯

/

前窗指

示燈號

Installing the CPU and Heatsink per Node/

安装节点模块CPU与散热片/安裝節點模組CPU
與散熱片

NOTE:      Turn off the system before inserting or removing 

the HDD or the Node.  

在插入或是移除硬盘前, 请先将主机电源关闭。

 

在插入或是移除硬碟前, 請先將主機電源關閉。

1.  Take the Node out of the chassis.  

取出节点模块。

 

取出節點模組。

2 x HH/HL 

Expansion Card

M.2 2280 B Key

24*DDR4 DIMM slot

CPU0 

LGA3647 socket

with full 

n heatsink

CPU1 

LGA3647 socket

with cut 

n heatsink

On board RAID

Intel X557 Chip

M.2 2280 B + M Key

Intel C622 PCH

SKY-524 View/

SKY-524视图

/

SKY-524視圖

Front view

Each node supports: 

• 

2 x NVMe/SAS/SSD drives. See Red HDD Tray for il-

lustration. 

• 

4 x SAS SSD Drives. See Orange HDD Tray for illustra-

tion.

Built-in FW RAID 0/1/10/5 function

Note!        1. NVMe support only when dual CPU has been 

installed (per node). 

2. The power button on the right side will boot up 

all nodes in the same time.   

3. Press right side power button for 4 seconds 

long to shut down all nodes at the same time. But 

please note the system fan will shut down for 10 

seconds after the whole system shut downs as a 

protection mechanism. 

Rear view

8 x NVMe /SAS/SSD  Drives

6* Drives for 

Node 1

6* Drives for 

Node 2

6* Drives for 

Node 3

6* Drives for 

Node 4

(1+1) 2200W Redundant PSU

Node 1

Node 2

Node 3

Node 4

Power bu

tt

on 

for Single Node power on/o

 control

Blue Light: Node Loca

ti

on LED

Red Light: Node Alert LED

2x 10Gb LAN

VGA

2x USB3.0

Dedicate IPMI LAN

PCIe Expansion  Slot (L)

PCIe Expansion  Slot (R) 

Enclosure management (via IPMI)

Flexible I/O port con

gura

ti

on 

10GbE RJ45 (default)

10GbE SFP+

1GbE  

PCIe Expansion  Slot (R)  

with Low pro

le bracket 

Support Half height / Half Length PCIe Card 

PCIe Expansion  Slot (L)  

with Low pro

le bracket 

Support Half height / Half Length PCIe Card 

Power bu

tt

on 

for Single Node power on/o

 control

Blue Light: Node Loca

ti

on LED

Red Light: Node Alert LED

2x 10Gb LAN

VGA

2x USB3.0

Dedicate IPMI LAN

PCIe Expansion  Slot (L)

PCIe Expansion  Slot (R) 

Enclosure management (via IPMI)

Flexible I/O port con

gura

ti

on 

10GbE RJ45 (default)

10GbE SFP+

1GbE  

PCIe Expansion  Slot (R)  

with Low pro

le bracket 

Support Half height / Half Length PCIe Card 

PCIe Expansion  Slot (L)  

with Low pro

le bracket 

Support Half height / Half Length PCIe Card 

  

System Setup

/系统安装/系統安裝

Содержание SKY-524 2U

Страница 1: ...h Density Server SKY 524 2U 4 SKY 524 2U 4 Startup Manual 1 1 SKY 524 2 1 3 8 2 4 24 2 5 5 1 6 Applicant Advantech Co Ltd Address 26 20 1 No 1 Alley 20 Lane 26 Rueiguang Road Neihu District Taipei 114...

Страница 2: ...MBase T IPMI LAN 2 x 10GBase T 1 x 100MBase T IPMI LAN Controller LAN1 Realtek RTL8201EL LAN2 3 Intel X557 AT2 Display Controller AST 2500 VRAM 64 MB video memory 64 MB 64 MB I O Interface I O I O Rea...

Страница 3: ...ole system shut downs as a protection mechanism Rear view 8 xNVMe SAS SSD Drives 6 Drives for Node 1 6 Drives for Node 2 6 Drives for Node 3 6 Drives for Node 4 1 1 2200W Redundant PSU Node 1 Node 2 N...

Страница 4: ...gle mark on the CPU against the triangle mark on the CPU socket then place the CPU with Heatsink into the CPU socket Note CPU1 must use Cut Fin Heatsink CPU0 must use Full Fin Heatsink as diagram belo...

Страница 5: ...ews to undo for the riser card bracket and installing riser cards Riser Card Bracket Riser Card Bracket Installing the Server in a Rack Follow these instructions to mount the SKY 524 into the rackmoun...

Страница 6: ...elease the locking latch upward and push the middle member forward to the rear of the slide Install the chassis As shown insert the inner member to the cabinet member Make sure the ball retainer is in...

Страница 7: ...re The equipment does not work well or you cannot get it to work according to the user s manual The equipment has been dropped and damaged The equipment has obvious signs of breakage 16 CAUTION The co...

Страница 8: ...move a equipment 33 Use only the power cords and power supply units provided with your equipment The equipment might have one or more power cords For North America a UL listed and CSA labeled power c...

Страница 9: ...4 SKY 524 9 18 19 20 21 1 22 VESA VESA 23 24 25 26 27 28 29 30 31 32 UL CSA 33 34 35 36 1 30 2 2 2 1 37 38 1 2 3 4 5 6 7 0 C 32 F 35 C 95 F 8 9 10 11 12 13 14 15 16 IEC 60825 1 EN60825 1 1 2 3 17 FCC...

Страница 10: ...e making any configuration changes The sudden rush of power as you connect a jumper or install a card may damage sensitive electronic components 3 Electronic components are also vulnerable to damage b...

Страница 11: ...rominated diphenyl ethers PBDE HDD 1 0 1 wt 0 01 wt Note 1 Exceeding 0 1 wt and exceeding 0 01 wt indicate that the percentage content of the restricted substance exceeds the reference percentage valu...

Отзывы: